×

System and Method for Monitoring and Controlling Wellbore Parameters

  • US 20110067882A1
  • Filed: 09/22/2009
  • Published: 03/24/2011
  • Est. Priority Date: 09/22/2009
  • Status: Abandoned Application
First Claim
Patent Images

1. An apparatus for use in producing a fluid from a formation, comprising:

  • a data storage device configured to store well data, including information about settings of a plurality of production devices corresponding to depth of the production devices in a well and at least one production parameter;

    a model that utilizes the well data; and

    a processor configured to;

    generate a well display depicting status of the production devices corresponding to their respective depths in the wellbore and values of the at least one production parameter corresponding to the well display, wherein the well display enables an operator to graphically input a desired value for the at least one production parameter at a selected depth in the well; and

    process the desired value using the model to determine a new setting of at least one production device in the plurality of production devices which setting of the at least one production device, when implemented, is expected to provide the desired value of the at least one production parameter.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×