1. A method for providing dispatchers in power grid control centers with a capability to manage changes, comprising:
- providing a comprehensive operating plan that has multiple dispatch engines 1, 2 and 3; and
wherein the dispatch engines are security constrained unit commitments and economic dispatch sequences with different look-ahead periods, the comprehensive operation plan being configured to integrate the security dispatch engines into a unified scheduling system.
3 Assignments
0 Petitions
Accused Products
Abstract
Methods are provided that enable dispatchers in power grid control centers to manage changes. A comprehensive operating plan is provided with multiple, security constrained economic dispatch engines 1, 2 and 3. The scheduler engines are security constrained unit commitments and economic dispatch sequences with different look-ahead periods. The comprehensive operation plan is configured to integrate scheduler engines into a unified scheduling system. The comprehensive operating plan includes a repository of all operating plans in a multi-stage decision process.
152 Citations
20 Claims
-
1. A method for providing dispatchers in power grid control centers with a capability to manage changes, comprising:
-
providing a comprehensive operating plan that has multiple dispatch engines 1, 2 and 3; and wherein the dispatch engines are security constrained unit commitments and economic dispatch sequences with different look-ahead periods, the comprehensive operation plan being configured to integrate the security dispatch engines into a unified scheduling system. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. A method for providing dispatchers in power grid control centers with a capability to manage changes, comprising:
-
providing a comprehensive operation plan that has multiple dispatch engines 1, 2 &
3;wherein the scheduler engines are security constrained unit commitments and economic dispatch sequences with different look-ahead periods, the comprehensive operation plan being configured to integrate scheduler engines into a unified scheduling system, and wherein the comprehensive operation plan includes a repository of all operating plans in a multi-stage decision process. - View Dependent Claims (11, 12, 13)
-
-
14. A method for providing dispatchers in power grid control centers with a capability to manage changes, comprising:
-
providing a comprehensive operating plan that has multiple, dispatch engines 1, 2 and 3; and wherein the scheduler engines are security constrained unit commitments and economic dispatch sequences with different look-ahead periods, the comprehensive operation plan being configured to integrate scheduler engines into a unified scheduling system; and wherein the comprehensive operation plan contains quantities that are scheduled over different operating intervals. - View Dependent Claims (15, 16, 17, 18, 19)
-
-
20. A method for providing dispatchers in power grid control centers with a capability to manage changes, comprising:
-
providing a comprehensive operating plan that has multiple dispatch engines 1, 2 and 3; wherein the scheduler engines are security constrained unit commitments and economic dispatch sequences with different look-ahead periods, the comprehensive operation plan being configured to integrate scheduler engines into a unified scheduling system; and wherein the comprehensive operation plan has a schedule time-line that is a variable time duration.
-