ROUTING GRAPHS FOR BUILDINGS USING SCHEMATICS
First Claim
1. A method comprising:
- obtaining electrical signals representing building information descriptive of at least a portion of a building structure;
superimposing a grid of points onto said building information;
analyzing said building information using said superimposed grid of points by projecting multiple rays from multiple points of said superimposed grid of points; and
generating electrical signals representing at least one routing graph responsive to said analyzing and based at least in part on said superimposed grid of points and said building information.
1 Assignment
0 Petitions
Accused Products
Abstract
The subject matter disclosed herein relates to systems, methods, etc. for creating a routing graph based at least partly on building information, which may include relatively low-detail schematics. For certain example implementations, a method may include obtaining building information descriptive of at least a portion of a building structure and superimposing a grid of points onto the building information. The building information may be analyzed using the superimposed grid of points by projecting multiple rays from multiple points of the superimposed grid of points. At least one routing graph may be created responsive to the analyzing and based at least in part on the superimposed grid of points and the building information. Other example implementations are described herein.
-
Citations
69 Claims
-
1. A method comprising:
-
obtaining electrical signals representing building information descriptive of at least a portion of a building structure; superimposing a grid of points onto said building information; analyzing said building information using said superimposed grid of points by projecting multiple rays from multiple points of said superimposed grid of points; and generating electrical signals representing at least one routing graph responsive to said analyzing and based at least in part on said superimposed grid of points and said building information. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18)
-
-
19. A special purpose computing device comprising:
-
at least one memory to store instructions; and one or more processors to execute said instructions to; obtain building information descriptive of at least a portion of a building structure; superimpose a grid of points onto said building information; analyze said building information using said superimposed grid of points by projecting multiple rays from multiple points of said superimposed grid of points; and create at least one routing graph responsive to said analyzing and based at least in part on said superimposed grid of points and said building information. - View Dependent Claims (20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35)
-
-
36. An article comprising:
- at least one storage medium having stored thereon instructions executable by one or more processors to;
obtain building information descriptive of at least a portion of a building structure; superimpose a grid of points onto said building information; analyze said building information using said superimposed grid of points by projecting multiple rays from multiple points of said superimposed grid of points; and create at least one routing graph responsive to said analyzing and based at least in part on said superimposed grid of points and said building information. - View Dependent Claims (37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52)
- at least one storage medium having stored thereon instructions executable by one or more processors to;
-
53. An apparatus comprising:
-
means for obtaining building information descriptive of at least a portion of a building structure; means for superimposing a grid of points onto said building information; means for analyzing said building information using said superimposed grid of points by projecting multiple rays from multiple points of said superimposed grid of points; and means for creating at least one routing graph responsive to said analyzing and based at least in part on said superimposed grid of points and said building information. - View Dependent Claims (54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69)
-
Specification