POWER OPERATION SYSTEM, POWER OPERATION METHOD AND PHOTOVOLTAIC POWER GENERATOR
First Claim
1. A power operation system comprising:
- a plurality of photovoltaic power generators connected to an electric power system through one same receiving end,each of said plurality of photovoltaic power generators includinga solar cell receiving sunlight and outputting electric power,a storage battery for storing said electric power,a communication interface for communication with another photovoltaic power generator, anda battery control unit for controlling storage of said electric power and output of said electric power to said electric power system,said battery control unit of a first photovoltaic power generator included in said plurality of photovoltaic power generators causing said first photovoltaic power generator to prioritize output of said electric power to said electric power system over storage of said electric power during a first time period, and causing a second photovoltaic power generator included in said plurality of photovoltaic power generators to prioritize output of said electric power to said electric power system over storage of said electric power during a second time period delayed by a prescribed time period from said first time period, through said communication interface.
1 Assignment
0 Petitions
Accused Products
Abstract
Each of a plurality of photovoltaic power generators includes a solar cell, a storage battery, a communication interface for communication, and a battery control unit for controlling storage of electric power and output of electric power to an electric power system. The battery control unit of the first photovoltaic power generator included in the plurality of photovoltaic power generators causes the first photovoltaic power generator to prioritize output of the electric power to the electric power system over storage of the electric power during the first time period, and causes the second photovoltaic power generator included in the plurality of photovoltaic power generators to prioritize output of the electric power to the electric power system over storage of the electric power during the second time period delayed by a prescribed time period from the first time period, through the communication interface.
24 Citations
9 Claims
-
1. A power operation system comprising:
-
a plurality of photovoltaic power generators connected to an electric power system through one same receiving end, each of said plurality of photovoltaic power generators including a solar cell receiving sunlight and outputting electric power, a storage battery for storing said electric power, a communication interface for communication with another photovoltaic power generator, and a battery control unit for controlling storage of said electric power and output of said electric power to said electric power system, said battery control unit of a first photovoltaic power generator included in said plurality of photovoltaic power generators causing said first photovoltaic power generator to prioritize output of said electric power to said electric power system over storage of said electric power during a first time period, and causing a second photovoltaic power generator included in said plurality of photovoltaic power generators to prioritize output of said electric power to said electric power system over storage of said electric power during a second time period delayed by a prescribed time period from said first time period, through said communication interface. - View Dependent Claims (2, 3)
-
-
4. A power operation system comprising:
-
a plurality of photovoltaic power generators connected to an electric power system through one same receiving end, each of said plurality of photovoltaic power generators including a solar cell receiving sunlight and outputting electric power, a storage battery for storing said electric power, and a battery control unit for controlling storage of said electric power and output of said electric power to said electric power system, said power operation system further comprising; a central control unit for causing a first photovoltaic power generator included in said plurality of photovoltaic power generators to prioritize output of said electric power to said electric power system over storage of said electric power during a first time period, and causing a second photovoltaic power generator included in said plurality of photovoltaic power generators to prioritize output of said electric power to said electric power system over storage of said electric power during a second time period delayed by a prescribed time period from said first time period.
-
-
5. A power operation system comprising:
-
a plurality of photovoltaic power generators connected to an electric power system through one same receiving end, each of said plurality of photovoltaic power generators including a solar cell receiving sunlight and outputting electric power, a storage battery for storing said electric power, a communication interface for communication with another photovoltaic power generator, and a battery control unit for controlling storage of said electric power and output of said electric power to said electric power system, said battery control unit of a first photovoltaic power generator included in said plurality of photovoltaic power generators causing said first photovoltaic power generator to prioritize output of said electric power to said electric power system over storage of said electric power during a first time period, and said battery control unit of a second photovoltaic power generator included in said plurality of photovoltaic power generators causing said second photovoltaic power generator to prioritize output of said electric power to said electric power system over storage of said electric power during a second time period delayed by a prescribed time period from said first time period.
-
-
6. A power operation method using a plurality of photovoltaic power generators connected to an electric power system through one same receiving end,
each of said plurality of photovoltaic power generators including a solar cell receiving sunlight and outputting electric power, a storage battery for storing said electric power, a communication interface for communication with another photovoltaic power generator, and a battery control unit for controlling storage of said electric power and output of said electric power to said electric power system, said power operation method comprising the steps of: said battery control unit of a first photovoltaic power generator included in said plurality of photovoltaic power generators causing said first photovoltaic power generator to prioritize output of said electric power to said electric power system over storage of said electric power during a first time period; and causing a second photovoltaic power generator included in said plurality of photovoltaic power generators to prioritize output of said electric power to said electric power system over storage of said electric power during a second time period delayed by a prescribed time period from said first time period, through said communication interface.
-
7. A power operation method using a plurality of photovoltaic power generators connected to an electric power system through one same receiving end, and a central control unit,
each of said plurality of photovoltaic power generators including a solar cell receiving sunlight and outputting electric power, a storage battery for storing said electric power, and a battery control unit for controlling storage of said electric power and output of said electric power to said electric power system, said power operation method comprising the steps of: -
said central control unit causing a first photovoltaic power generator included in said plurality of photovoltaic power generators to prioritize output of said electric power to said electric power system over storage of said electric power during a first time period; and said central control unit causing a second photovoltaic power generator included in said plurality of photovoltaic power generators to prioritize output of said electric power to said electric power system over storage of said electric power during a second time period delayed by a prescribed time period from said first time period.
-
-
8. A power operation method using a plurality of photovoltaic power generators connected to an electric power system through one same receiving end,
each of said plurality of photovoltaic power generators including a solar cell receiving sunlight and outputting electric power, a storage battery for storing said electric power, and a battery control unit for controlling storage of said electric power and output of said electric power to said electric power system, said power operation method comprising the steps of: -
said battery control unit of a first photovoltaic power generator included in said plurality of photovoltaic power generators causing said first photovoltaic power generator to prioritize output of said electric power to said electric power system over storage of said electric power during a first time period; and said battery control unit of a second photovoltaic power generator included in said plurality of photovoltaic power generators causing said second photovoltaic power generator to prioritize output of said electric power to said electric power system over storage of said electric power during a second time period delayed by a prescribed time period from said first time period.
-
-
9. A photovoltaic power generator comprising:
-
a solar cell receiving sunlight and outputting electric power; a storage battery for storing said electric power; a communication interface for communication with another photovoltaic power generator connected to an electric power system through one same receiving end; and a battery control unit for controlling storage of said electric power and output of said electric power to said electric power system, said battery control unit causing said photovoltaic power generator to prioritize output of said electric power to said electric power system over storage of said electric power during a first time period, and causing at least one said another photovoltaic power generator to prioritize output of said electric power to said electric power system over storage of said electric power during a second time period delayed by a prescribed time period from said first time period, through said communication interface.
-
Specification