×

SYSTEM AND METHOD FOR MANAGING INFORMATION TECHNOLOGY MODELS IN AN INTELLIGENT WORKLOAD MANAGEMENT SYSTEM

  • US 20110126047A1
  • Filed: 03/19/2010
  • Published: 05/26/2011
  • Est. Priority Date: 11/25/2009
  • Status: Active Grant
First Claim
Patent Images

1. A system for managing information technology models in an intelligent workload management system, comprising:

  • an identity vault that stores federated information defining unique identities for a plurality of managed entities across a plurality of authentication domains;

    a discovery engine that populates a model of an information technology infrastructure and enriches the model of the information technology infrastructure with the federated information stored in the identity vault and identity information obtained from the information technology infrastructure; and

    a management infrastructure that manages one or more planned changes to the model of the information technology infrastructure, wherein the management infrastructure is configured to;

    construct an implementation plan for the planned changes to the model of the information technology infrastructure, wherein the implementation plan includes an approval workflow that coordinates interaction between one or more human approvers and one or more of the plurality of managed entities;

    manage the implementation plan constructed for the planned changes, wherein managing the implementation plan includes coordinating the interaction between the one or more human approvers and the one or more of the plurality of managed entities to implement the planned changes in the information technology infrastructure;

    capture a snapshot of the planned information technology infrastructure in response to implementing the planned changes in the information technology infrastructure;

    compare the snapshot of the planned information technology infrastructure to the operational state for the information technology infrastructure; and

    detect a real-time drift in the operational state for the information technology infrastructure in response to determining that the operational state for the information technology infrastructure does not conform to the snapshot of the planned information technology infrastructure.

View all claims
  • 16 Assignments
Timeline View
Assignment View
    ×
    ×