CHANGE MANAGEMENT IN ROUTE-BASED PROJECTS
First Claim
1. A computer-implemented method for managing change in a design of a route-based project, the method comprising:
- in a data processing system,receiving first data regarding a proposed change to the design of a route-based project, the first received data comprising a ticket;
associating the ticket with design of the project in a geographic information system (GIS);
communicating the proposed change to an Analyst;
receiving spatializing data regarding the proposed change, the ticket and spatializing data comprising a spatialized ticket;
communicating the spatialized ticket to a Quality Control Administrator;
receiving quality control approval of the spatialized ticket;
communicating the quality control approved ticket to at least one reviewer;
receiving a recommendation from at least one of the at least one reviewers, the recommendations and the quality control approved ticket comprising a reviewed ticket;
communicating the reviewed ticket to at least one approver;
receiving approval from at least one of the at least on approver, the approval and the reviewed ticket comprising an approved ticket; and
committing the change described in the reviewed ticket to the GIS.
5 Assignments
0 Petitions
Accused Products
Abstract
Managing change in the design of a route-based project. Receiving data (a ticket) regarding a proposed change to the design of a route-based project. Associating the ticket with a project in a geographic information system (GIS). Communicating the ticket to an Analyst. Receiving spatializing data regarding the ticket. The ticket and spatializing data comprising a spatialized ticket. Communicating the spatialized ticket to a Quality Control Administrator. Receiving quality control approval of the spatialized ticket. Communicating the quality control approved ticket to at least one reviewer. Receiving recommendation from reviewers. The recommendations and the quality control approved ticket comprising a reviewed ticket. Communicating the reviewed ticket to at least one approver. Receiving approval from the approver. The approval and the reviewed ticket comprising an approved ticket. Committing the change described in the approved ticket to the GIS.
28 Citations
3 Claims
-
1. A computer-implemented method for managing change in a design of a route-based project, the method comprising:
in a data processing system, receiving first data regarding a proposed change to the design of a route-based project, the first received data comprising a ticket; associating the ticket with design of the project in a geographic information system (GIS); communicating the proposed change to an Analyst; receiving spatializing data regarding the proposed change, the ticket and spatializing data comprising a spatialized ticket; communicating the spatialized ticket to a Quality Control Administrator; receiving quality control approval of the spatialized ticket; communicating the quality control approved ticket to at least one reviewer; receiving a recommendation from at least one of the at least one reviewers, the recommendations and the quality control approved ticket comprising a reviewed ticket; communicating the reviewed ticket to at least one approver; receiving approval from at least one of the at least on approver, the approval and the reviewed ticket comprising an approved ticket; and committing the change described in the reviewed ticket to the GIS.
-
2. A computer program product for managing change in a design of a route-based project, the method comprising:
-
computer readable media, and program code, residing on the medium and containing instructions that when executed by a processor; receive first data regarding a proposed change to the design of a route-based project, the first received data comprising a ticket; associate the ticket with design of the project in a geographic information system (GIS); communicate the proposed change to an Analyst; receive spatializing data regarding the proposed change, the ticket and spatializing data comprising a spatialized ticket; communicate the spatialized ticket to a Quality Control Administrator; receive quality control approval of the spatialized ticket; communicate the quality control approved ticket to at least one reviewer; receive a recommendation from at least one of the at least one reviewers, the recommendations and the quality control approved ticket comprising a reviewed ticket; communicate the reviewed ticket to at least one approver; receive approval from at least one of the at least on approver, the approval and the reviewed ticket comprising an approved ticket; and commit the change described in the reviewed ticket to the GIS.
-
-
3. A system for managing change in a design of a route-based project, the method comprising:
-
at least one processor, computer readable media, and program code, residing on the medium and containing instructions that when executed by the at least one processor; receive first data regarding a proposed change to the design of a route-based project, the first received data comprising a ticket; associate the ticket with design of the project in a geographic information system (GIS); communicate the proposed change to an Analyst; receive spatializing data regarding the proposed change, the ticket and spatializing data comprising a spatialized ticket; communicate the spatialized ticket to a Quality Control Administrator; receive quality control approval of the spatialized ticket; communicate the quality control approved ticket to at least one reviewer; receive a recommendation from at least one of the at least one reviewers, the recommendations and the quality control approved ticket comprising a reviewed ticket; communicate the reviewed ticket to at least one approver; receive approval from at least one of the at least on approver, the approval and the reviewed ticket comprising an approved ticket; and commit the change described in the reviewed ticket to the GIS.
-
Specification