×

SYSTEM AND METHOD FOR PROVIDING AUXILIARY POWER BY REGENERATION POWER MANAGEMENT IN MOBILE MINING EQUIPMENT

  • US 20110175579A1
  • Filed: 02/24/2011
  • Published: 07/21/2011
  • Est. Priority Date: 05/15/2009
  • Status: Active Grant
First Claim
Patent Images

1. A method for operating an ultracapacitor system used in a mining excavator powered by an electrical power source, comprising the steps of:

  • detecting whether a line power from the electrical power source is present;

    measuring a voltage level of the ultracapacitor system if the line power is not present;

    comparing the measured voltage level with a minimum voltage level for the ultracapacitor system; and

    supplying auxiliary power from the ultracapacitor system to operate mining excavator systems if the measured voltage level is more than the minimum voltage level.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×