×

Power Converter with an Adaptive Controller and Method of Operating the Same

  • US 20110205763A1
  • Filed: 02/25/2010
  • Published: 08/25/2011
  • Est. Priority Date: 12/01/2006
  • Status: Active Grant
First Claim
Patent Images

1. A power converter including a power switch configured to conduct for a duty cycle and provide a regulated output characteristic at an output thereof, comprising:

  • a controller configured to provide a signal to control said duty cycle of said power switch as a function of said output characteristic, said controller regulating an internal operating characteristic of said power converter to improve an operating efficiency of said power converter depending on a value of one of a parameter of said power converter measured after a manufacturing step and an environmental parameter for said power converter.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×