×

POWER CONSUMPTION MANAGEMENT SYSTEM, AND POWER CONSUMPTION MANAGER, POWER CONSUMPTION MANAGEMENT METHOD, POWER SUPPLY MANAGER, AND POWER SUPPLY MANAGEMENT METHOD, WHICH ARE USED FOR THE POWER CONSUMPTION MANAGEMENT SYSTEM

  • US 20110270459A1
  • Filed: 03/02/2011
  • Published: 11/03/2011
  • Est. Priority Date: 04/28/2010
  • Status: Active Grant
First Claim
Patent Images

1. A power consumption management system for managing power consumption of one or more structures as management targets, comprising:

  • a power supply manager that manages power supply to each of the structures; and

    a power consumption manager that is placed for each of the structures in order to manage the power consumption regarding a load of equipment of each of the structures and is connected to the power supply manager through a network, whereinthe power supply manager comprises;

    a management unit that determines whether or not it is necessary to request a change of the power consumption for each of the structures;

    a request unit that transmits a changeable power amount acquisition request to the power consumption manager when the management unit determines that it is necessary to request the change of the power consumption for the structure; and

    a notification unit that acquires changeable power amount information transmitted from the power consumption manager based on the changeable power amount acquisition request transmitted from the request unit, decides a power change request amount for each of the structures based on the acquired changeable power amount information, and transmits the decided power change request amount to each of the power consumption managers for a purpose of notification, andthe power consumption manager comprises;

    an information creation unit that, upon receiving the changeable power amount information acquisition request transmitted from the power supply manager, creates the changeable power amount information with respect to a planned value of the power consumption for each predetermined time range in a preset predetermined period in future, the planned value being related to a load of each piece of equipment in the structure, and transmits the created changeable power amount information to the power supply manager; and

    a control unit that acquires the power change request amount transmitted from the power supply manager based on the changeable power amount information of the power consumption, the changeable power amount information being transmitted from the information creation unit, decides an operation control amount of the load of each piece of the equipment in the structure based on the acquired power change request amount, and controls the applying load of the equipment.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×