×

DYNAMIC LOAD SHEDDING SYSTEM FOR A STANDBY GENERATOR

  • US 20110298286A1
  • Filed: 06/03/2010
  • Published: 12/08/2011
  • Est. Priority Date: 06/03/2010
  • Status: Active Grant
First Claim
Patent Images

1. A method of managing a plurality of electric loads powered by a standby generator, the method comprising the steps of:

  • interconnecting each of the plurality of electric loads to one of a plurality of outputs such that the electric loads receive power through the outputs;

    assigning an initial priority value to each of the electric loads between a highest priority value and a lowest priority value;

    monitoring the combined load on the generator;

    selectively disconnecting the electric loads from the generator in a sequential order from the lowest priority value to the highest priority value when the combined load on the generator reaches a rated value for the generator, wherein the electric loads having the lowest priority value are sequentially disconnected from the generator until the combined load on the generator falls below the rated value for the generator; and

    selectively reassigning the priority values to one or more of the electric loads to modify the order the electric loads are disconnected from the generator.

View all claims
  • 8 Assignments
Timeline View
Assignment View
    ×
    ×