×

SUPPLY-DEMAND BALANCE CONTROLLER

  • US 20120065792A1
  • Filed: 03/24/2011
  • Published: 03/15/2012
  • Est. Priority Date: 09/09/2010
  • Status: Active Grant
First Claim
Patent Images

1. A supply-demand balance controller for creating a power supply plan in a predetermined period, comprising:

  • a collection controller configured to collect, from each customer, power demand data showing power consumed by customer appliances in customer'"'"'s buildings, the customer appliances including a controllable appliance whose power consumption can be controlled from outside;

    a first storage configured to store a history of the power demand of each customer;

    a first predicting unit configured to predict a power demand by each customer in the predetermined period, based on the history in the first storage;

    a second storage configured to store a predictive power demand obtained by the first predicting unit;

    a first reliability value calculator configured to calculate a reliability value for the predictive power demand obtained by the first predicting unit with respect to each customer, based on a difference between the power demand previously stored in the first storage and the predictive power demand previously obtained by the first predicting unit with respect to the previous power demand;

    a power receiving unit configured to receive power supply from a power system, the power system generating power with a plurality of power generating units;

    a distribution unit configured to distribute the power received at the power receiving unit to the customers;

    a power supply acquiring unit configured to acquire data concerning power supply from the power system with respect to each power generating unit;

    a third storage configured to store a history of power supply with respect to each power generating unit;

    a second predicting unit configured to predict power to be supplied in the predetermined period with respect to each power generating unit, based on the history stored in the third storage;

    a fourth storage configured to store data of predictive power supply obtained by the second predicting unit;

    a second reliability value calculator configured to calculate a reliability value for the predictive power supply obtained by the second predicting unit with respect to each power generating unit, based on a difference between the power supply previously stored in the third storage and the predictive power supply previously obtained by the second predicting unit with respect to the previous power supply;

    a balancing unit configured to obtain a supply-demand margin level based on a difference between;

    a first weighted sum of the predictive power demand calculated by the first predicting unit by weight depending on the reliability value calculated by the first reliability value calculator; and

    a second weighted sum of the predictive power supply calculated by the second predicting unit by a weight depending on the reliability value calculated by the second reliability value calculator; and

    a plan creator configured to create a plan for controlling power used by the controllable appliances of each customer in the predetermined period, based on the supply-demand margin level.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×