SYSTEM AND METHODS FOR ADAPTIVE LOT SIZING IN CELLULAR MANUFACTURING
First Claim
Patent Images
1. A method of balancing workload across multiple cells in a cellular manufacturing environment, the method comprising:
- compiling a listing of a plurality of jobs and cells using a computer operable processor, wherein the plurality of jobs are to be produced by at least some of the plurality of cells, and each of the cells include at least one production device; and
auto-splitting the jobs into smaller sized lots using a split-then-merge operation to adapt the lots to cell workloads while returning lot sizes that are no more fine grained than necessary.
1 Assignment
0 Petitions
Accused Products
Abstract
The present application presents a new and improved system and method of enhanced Lean Document Production (LDP), which employs cellular manufacturing concepts. The LDP process incorporates an auto-splitting algorithm and/or an earliest completion route algorithm to generate an operation schedule.
-
Citations
18 Claims
-
1. A method of balancing workload across multiple cells in a cellular manufacturing environment, the method comprising:
-
compiling a listing of a plurality of jobs and cells using a computer operable processor, wherein the plurality of jobs are to be produced by at least some of the plurality of cells, and each of the cells include at least one production device; and auto-splitting the jobs into smaller sized lots using a split-then-merge operation to adapt the lots to cell workloads while returning lot sizes that are no more fine grained than necessary. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A method of balancing workload across multiple cells in a manufacturing environment, the method comprising:
-
compiling a listing of a plurality of jobs and cells using a computer operable processor, wherein the plurality of jobs are to be produced by at least some of the plurality of cells, and each of the cells include at least one production device; enumerating feasible routes in the manufacturing environment with a preference to routes having fewer inter-cell hops; assigning the jobs to the cells using an earliest-completion-route algorithm, wherein a specific job is assigned to a specific cell that provides an earliest completion time for the specific job; and generating a job schedule for job production based on the results of the earliest-completion-route algorithm. - View Dependent Claims (10, 11, 12, 13)
-
-
14. A method of balancing workload across multiple cells in a cellular manufacturing environment, the method comprising:
-
compiling a listing of a plurality of jobs and cells using a computer operable processor, wherein the plurality of jobs are to be produced by at least some of the plurality of cells, and each of the cells include at least one production device; assigning the jobs to the cells using an earliest-completion-route scheduling strategy; and generating a job schedule for job production based on the results of the earliest-completion-rout scheduling strategy. - View Dependent Claims (15, 16, 17, 18)
-
Specification