MANAGING ENERGY DEMAND IN AN INFRASTRUCTURE
First Claim
Patent Images
1. A method for managing energy demand in an infrastructure, the method comprising:
- determining, by a processor, a coefficient of performance (COP) of the infrastructure as a function of time, wherein the COP is a measure of efficiency of the infrastructure;
determining an energy demand on the infrastructure as a function of time; and
determining an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure.
2 Assignments
0 Petitions
Accused Products
Abstract
In a method for managing energy demand in an infrastructure, a coefficient of performance (COP) of the infrastructure as a function of time is determined. The COP is a measure of efficiency of the infrastructure. In addition, an energy demand on the infrastructure as a function of time is determined and an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure is determined.
8 Citations
20 Claims
-
1. A method for managing energy demand in an infrastructure, the method comprising:
-
determining, by a processor, a coefficient of performance (COP) of the infrastructure as a function of time, wherein the COP is a measure of efficiency of the infrastructure; determining an energy demand on the infrastructure as a function of time; and determining an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. An apparatus for managing energy demand in an infrastructure, the apparatus is comprising:
-
one or more modules to determine a coefficient of performance (COP) of the infrastructure as a function of time, wherein the COP is a measure of efficiency of the infrastructure, to determine an energy demand on the infrastructure as a function of time, and to determine an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure; and a processor to implement the one or more modules. - View Dependent Claims (12, 13, 14, 15, 16, 17, 18, 19)
-
-
20. A computer readable storage medium on which is embedded one or more computer programs, said one or more computer programs implementing a method for managing energy demand in an infrastructure, said one or more computer programs comprising computer readable code to:
-
determine a coefficient of performance (COP) of the infrastructure as a function of time, wherein the COP is a measure of efficiency of the infrastructure; determine an energy demand on the infrastructure as a function of time; and determine an energy demand schedule for the infrastructure that temporally reallocates the energy demand based upon the determined COP of the infrastructure.
-
Specification