SCHEDULING TO MAXIMIZE UTILIZATION PREFERRED POWER SOURCES (SMUPPS)
First Claim
Patent Images
1. A method for power utilization scheduling, the method comprising:
- determining a prioritized energy consumption schedule based on a prioritized energy consumption;
determining a per-process energy consumption model based on an energy consumption model; and
scheduling an operation based on the prioritized energy consumption schedule and the per-process energy consumption model.
1 Assignment
0 Petitions
Accused Products
Abstract
A power utilization scheduling system and methods are disclosed. A prioritized energy consumption schedule is determined based on a prioritized energy consumption. A per-process energy consumption model is determined based on an energy consumption model, and an operation is scheduled based on the prioritized energy consumption schedule and the per-process energy consumption model.
-
Citations
20 Claims
-
1. A method for power utilization scheduling, the method comprising:
-
determining a prioritized energy consumption schedule based on a prioritized energy consumption; determining a per-process energy consumption model based on an energy consumption model; and scheduling an operation based on the prioritized energy consumption schedule and the per-process energy consumption model. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A power utilization scheduling system comprising:
-
an energy consumption schedule prioritization module operable to determine a prioritized energy consumption schedule based on a prioritized energy consumption; a per-process energy consumption model module operable to determine a per-process energy consumption model based on an energy consumption model; and an operation scheduling module operable to schedule an operation based on the prioritized energy consumption schedule and the per-process energy consumption model. - View Dependent Claims (9, 10, 11, 12, 13)
-
-
14. A computer readable storage medium comprising computer executable instructions for performing a method for power utilization scheduling, the method executed by the compute-executable instructions comprising:
-
determining a prioritized energy consumption schedule based on a prioritized energy consumption; determining a per-process energy consumption model based on an energy consumption model; and scheduling an operation based on the prioritized energy consumption schedule and the per-process energy consumption model. - View Dependent Claims (15, 16, 17, 18, 19, 20)
-
Specification