×

PRODUCTION MANAGEMENT WITH MULTI-TYPE KANBAN MODELING

  • US 20120136758A1
  • Filed: 11/30/2010
  • Published: 05/31/2012
  • Est. Priority Date: 11/30/2010
  • Status: Abandoned Application
First Claim
Patent Images

1. A computer implemented method for managing production in a multi kanban environment, the method comprising:

  • setting, on a computer, a plurality of reorder points for a plurality of products, the plurality of reorder points comprising a first reorder point and a second reorder point, the second reorder point greater than the first reorder point;

    determining, on the computer, demand for one or more of the plurality of products over a plurality of time periods;

    determining, on the computer, an inventory level of the one or more of the plurality of products over the plurality of time periods in response to determining the demand;

    issuing, on the computer, one or more normal kanbans for one or more of the plurality of time periods in response to determining that the inventory level of one or more of the plurality of products is below the first reorder point, the one or more of the plurality of time periods including a current time period;

    issuing, on the computer, one or more build ahead kanbans for the one or more of the plurality of time periods in response to determining that the inventory level of one or more of the plurality of products is below the second reorder point but above the first reorder point;

    approving, on the computer, for production in the current time period the one or more normal kanbans issued for the current time period;

    determining, on the computer, if excess capacity exists to produce additional kanbans;

    approving, on the computer, for production in the current time period one or more of the one or more build ahead kanbans in response to determining that excess capacity exists.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×