×

OPERATION SCHEDULER FOR A BUILDING AUTOMATION SYSTEM

  • US 20120143378A1
  • Filed: 12/02/2011
  • Published: 06/07/2012
  • Est. Priority Date: 12/03/2010
  • Status: Active Grant
First Claim
Patent Images

1. A building automation control system configured to manage and control multiple automation components couple via a building automation network, the building automation control tool comprising:

  • a processor;

    a memory in communication with the processor, the memory configured to store a building automation control tool as one or more processor implementable instructions and wherein the processor implementable instructions are configured to;

    receive a first operational schedule comprising a first start time and a first stop time related to the operation of a first automation device;

    receive a second operational schedule comprising a second start time and a second stop time related to the operation of a second automation device;

    recognize the first and second start and stop times associated with the first and second operational schedules, respectively; and

    generate a unified schedule that;

    displays the first operational schedule as a first time period that extends between the first start time and the first stop time; and

    displays the second operational schedule as a second time period that extends between the second start time and the second stop time, wherein the second time period is aligned relative to the first time period.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×