1. A method comprising:

  • determining, by a processor, a usage allocation of a hardware resource to each workload of a plurality of workloads over time, using a demand model, the usage allocation of the hardware resource including a current and past actual usage allocation of the hardware resource, a future projected usage allocation of the hardware resource, and a current and past actual usage of the hardware resource as monitored;

    determining, by the processor, a capacity allocation of the hardware resource, using a capacity model, the capacity allocation of the hardware resource including a current and past capacity of the hardware resource and a future projected capacity of the hardware resource;

    determining, by the processor, whether a gap exists between the usage allocation of the hardware resource and the capacity allocation of the hardware resource, using a mapping model; and

    ,in response to determining that the gap exists between the usage allocation of the hardware resource and the capacity allocation of the hardware resource, presenting a user with one or more options determined by the processor using the mapping model and selectable by the user to implement a remediation strategy to close the gap.