×

PREDICTIVE RESOURCE MANAGEMENT

  • US 20120173477A1
  • Filed: 12/29/2010
  • Published: 07/05/2012
  • Est. Priority Date: 12/29/2010
  • Status: Active Grant
First Claim
Patent Images

1. An apparatus, comprising:

  • a monitoring module to monitor database system resource consumption over time, in conjunction with scheduled data loading, data export, and query operations; and

    a processor to generate a database system resource consumption map based on the database system resource consumption over time, and to adjust database system workload throttling to accommodate predicted database system resource consumption based on the resource consumption map and current system loading induced by at least one of data loading, data export, or query activity, prior to the current database resource consumption reaching a predefined critical consumption level.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×