Please download the dossier by clicking on the dossier button x
×

CONTROLLING POWER SEQUENCE IN A BLADE CENTER ENVIRONMENT

  • US 20120198261A1
  • Filed: 03/08/2012
  • Published: 08/02/2012
  • Est. Priority Date: 02/19/2008
  • Status: Active Grant
First Claim
Patent Images

1. A method to control power sequencing in a blade center environment, the comprising:

  • creating a topology of interdependent relationships of devices in the blade center environment, the devices comprising server blades, storage blades, and switch modules;

    defining a sequence of the devices in the blade center environment to power off and on based on the topology of interdependent relationships, the sequence comprising an order of a first independent blade server, each dependent storage blade of the first independent blade server, and a second independent blade server;

    monitoring a command from an Advanced Management Module (AMM) to regulate power for devices in the blade center environment, wherein the AMM regulates power within the blade center; and

    validating that the command does not violate the interdependent relationships and the sequence of devices else block the command if the command is not validated.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×