×

Intelligent Railway System for Preventing Accidents at Railway Passing Points and Damage to the Rail Track

  • US 20120203402A1
  • Filed: 02/07/2011
  • Published: 08/09/2012
  • Est. Priority Date: 02/07/2011
  • Status: Abandoned Application
First Claim
Patent Images

1. A method for managing trains on a railway track, said method including:

  • analyzing track measurement data from a plurality of track sensors positioned along the railway track to collect the track measurement data, the track measurement data indicating physical loads exerted on the railway track at the track sensors; and

    estimating, based on said analyzing of the track measurement data from the plurality of track sensors, at least one of;

    at least one lower risk point of passing between a first train and at least one second train, the first train traveling in a first direction along the railway track, and the second train traveling in a second direction along the railway track opposite the first direction,at least one speed of the first train to arrive at the lower risk point of passing at the same time as the second train, andat least one speed of the second train to arrive at the lower risk point of passing at the same time as the first train.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×