WORKSITE MANAGEMENT SYSTEM IMPLEMENTING ANTICIPATORY MACHINE CONTROL
First Claim
1. A worksite management system for use with a mobile machine, comprising:
- a control module located onboard the mobile machine and configured to control operations of the mobile machine; and
a controller in communication with the control module and configured to;
anticipate a non-failure machine performance irregularity;
determine an adjustment to an operation of the mobile machine that positively affects the machine performance irregularity; and
cause implementation of the adjustment before the machine performance irregularity occurs.
1 Assignment
0 Petitions
Accused Products
Abstract
A worksite management system for use with a mobile machine is disclosed. The worksite management system may have a control module located onboard the mobile machine and configured to control operations of the mobile machine, and a controller in communication with the control module. The controller may be configured to anticipate a non-failure machine performance irregularity, and determine an adjustment to an operation of the mobile machine that positively affects the machine performance irregularity. The controller may also be configured to cause implementation of the adjustment before the machine performance irregularity occurs.
-
Citations
20 Claims
-
1. A worksite management system for use with a mobile machine, comprising:
-
a control module located onboard the mobile machine and configured to control operations of the mobile machine; and a controller in communication with the control module and configured to; anticipate a non-failure machine performance irregularity; determine an adjustment to an operation of the mobile machine that positively affects the machine performance irregularity; and cause implementation of the adjustment before the machine performance irregularity occurs. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
-
12. A worksite management system for use with a mobile machine, comprising:
-
a control module located onboard the mobile machine and configured to control operations of the mobile machine; and a worksite controller in communication with the control module and configured to; anticipate a machine performance irregularity associated with at least one of a productivity, an efficiency, a fuel economy, a speed, or a traffic congestion based on at least one of a weather condition, a payload, a braking event, wheel slip, machine location, or a worksite condition; determine an adjustment to at least one of a speed, a transmission shifting, an acceleration, a differential locking, or a maneuvering of the mobile machine that positively affects the machine performance irregularity; and directly implement the adjustment before the machine performance irregularity occurs.
-
-
13. A method of managing a worksite, comprising:
-
collecting data associated with at least one of a machine operation at the worksite and a worksite condition; analyzing the data to anticipate a non-failure machine performance irregularity; determining an adjustment to an operation of a mobile machine at the worksite that positively affects the machine performance irregularity; and implementing the adjustment before the machine performance irregularity occurs. - View Dependent Claims (14, 15, 16, 17, 18, 19, 20)
-
Specification