ELECTRIC POWER SUPPLY SYSTEM AND METHOD FOR CONTROLLING ELECTRIC POWER DISCHARGE
First Claim
1. An electric power supply system comprising:
- an electric power accumulating device configured to be charged with electric power, which is supplied from an electric power system into a building under a contract, and configured to discharge electric power to a load device of the building;
a control device configured tostore an electric power consumption result of the load device,rewrite a previous electric power consumption result to update the electric power consumption result as learning information, andcontrol electric power discharge from the electric power accumulating device to the load device with reference to the learning information, whereinthe control unit is further configured topredict, with reference to the learning information, an electric power consumption consumed by the load device in each time zone in one day,determine, according to the predicted electric power consumption in each time zone in one day, a discharge implementation time zone or a discharge threshold, andimplement electric power discharge from the electric power accumulating device to the load device,when determining that present time is in the discharge implementation time zone in one day, orwhen a load electric power consumed by the load device is greater than or equal to the determined discharge threshold.
1 Assignment
0 Petitions
Accused Products
Abstract
An electric power accumulating device is charged with electric power supplied from an electric power system and is configured to discharge electric power to a load device. A control unit predicts, with reference to an electric power consumption result of the load device, an electric power consumption of the load device in each time zone in one day and determines, according to the predicted electric power consumption, a discharge implementation time zone or a discharge threshold. The control unit causes the electric power accumulating device to discharge electric power to the load device when determining that the present time is in the discharge implementation time zone or when an electric power consumed by the load device is greater than or equal to the determined discharge threshold.
-
Citations
4 Claims
-
1. An electric power supply system comprising:
-
an electric power accumulating device configured to be charged with electric power, which is supplied from an electric power system into a building under a contract, and configured to discharge electric power to a load device of the building; a control device configured to store an electric power consumption result of the load device, rewrite a previous electric power consumption result to update the electric power consumption result as learning information, and control electric power discharge from the electric power accumulating device to the load device with reference to the learning information, wherein the control unit is further configured to predict, with reference to the learning information, an electric power consumption consumed by the load device in each time zone in one day, determine, according to the predicted electric power consumption in each time zone in one day, a discharge implementation time zone or a discharge threshold, and implement electric power discharge from the electric power accumulating device to the load device, when determining that present time is in the discharge implementation time zone in one day, or when a load electric power consumed by the load device is greater than or equal to the determined discharge threshold. - View Dependent Claims (2, 3)
-
-
4. A method for controlling electric power discharge from an electric power accumulating device, the electric power accumulating device being configured to be charged with electric power, which is supplied from an electric power system into a building under a contract, and configured to discharge electric power to a load device of the building, the method comprising:
-
predicting an electric power consumption consumed by the load device in each time zone in one day, with reference to an electric power consumption result of the load device being stored and updated; determining, according to the predicted electric power consumption, a discharge implementation time zone or a discharge threshold; and causing the electric power accumulating device to discharge electric power to the load device, when determining that present time is in the discharge implementation time zone, or when a load electric power consumed by the load device is greater than or equal to the determined discharge threshold.
-
Specification