×

DETERMINING ELECTRIC GRID ENDPOINT PHASE CONNECTIVITY

  • US 20120232844A1
  • Filed: 05/25/2012
  • Published: 09/13/2012
  • Est. Priority Date: 09/05/2008
  • Status: Active Grant
First Claim
Patent Images

1. A method of determining a service phase of an endpoint device in a power distribution system, the method comprising:

  • sending a message to a point in the power distribution system requesting a disturbance on one of a plurality of power distribution phases of a feeder line to customer sites;

    receiving a report from each of a plurality of endpoint devices at respective customer sites indicating that the requested disturbance was detected by each of the plurality of endpoint devices; and

    based on the received reports, mapping at least one endpoint device that reported the detection of the disturbance to the respective phase on which the disturbance was created, thus identifying which of the plurality of phases the feeder line of the endpoint device is serviced by.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×