ELECTRICAL DISTRIBUTION NETWORK IMPROVEMENT FOR PLUG-IN ELECTRIC VEHICLES
First Claim
Patent Images
1. An electrical distribution network improvement method comprising:
- receiving user input, wherein the user input comprises electrical distribution network (EDN) configuration information, demography information and load information;
storing the user input in a database;
performing a first simulation using a simulator based at least on the EDN configuration information, the demography information or the load information stored in the database to obtain a first simulation result;
analyzing the first simulation result using an analytics engine to obtain a first interpretation result;
determining at least one improvement program based on the first interpretation result;
updating the EDN configuration information based on the determined improvement program;
performing an improvement simulation based on the updated EDN configuration information; and
applying the improvement program to the EDN.
3 Assignments
0 Petitions
Accused Products
Abstract
Electrical distribution network (EDN) improvement method for plug-in electric vehicles receives and stores in a database EDN configuration information, demography information and load information for simulating load of the EDN assets. The method dynamically updates the EDN configuration, demography information and/or load information to provide an efficient and customizable method of simulating a PEV load impact on an EDN configuration and apply improvements to the EDN in real time.
7 Citations
5 Claims
-
1. An electrical distribution network improvement method comprising:
-
receiving user input, wherein the user input comprises electrical distribution network (EDN) configuration information, demography information and load information; storing the user input in a database; performing a first simulation using a simulator based at least on the EDN configuration information, the demography information or the load information stored in the database to obtain a first simulation result; analyzing the first simulation result using an analytics engine to obtain a first interpretation result; determining at least one improvement program based on the first interpretation result; updating the EDN configuration information based on the determined improvement program; performing an improvement simulation based on the updated EDN configuration information; and applying the improvement program to the EDN. - View Dependent Claims (2, 3, 4, 5)
-
Specification