Load Leveling System of Power System
First Claim
1. A load leveling system of a power system comprising:
- a function of being applied to the power system including a major customer and lower transforming apparatus connected to an upper transforming apparatus via a high-voltage line and a customer connected to the lower transforming apparatus via a low-voltage line, arranging a communication unit between the customer and its own system, and outputting change request information of an operation time of devices within the customer;
a prediction function of predicting at least electric demands of the upper transforming apparatus and the lower transforming apparatus; and
a function of outputting the change request information of the operation time of devices within the customer so as to reduce a maximum value of electric demands of both the upper transforming apparatus and the lower transforming apparatus.
1 Assignment
0 Petitions
Accused Products
Abstract
It is an object of the present invention to provide a load leveling system of a power system capable of attaining load leveling in a distribution substation unit and a method thereof. Disclosed is a load leveling system of a power system with a controller having a major customer and lower transforming apparatus, and with a customer connected to the lower transforming apparatus via a low-voltage line. The system also has a communication unit between the customer and its own system, and control use time zones of devices within the customer; an electric demand prediction unit, and a first load leveling processing unit. By employing such an arranged system, it becomes possible to provide a load leveling system of a power system capable of realizing load leveling of both a distribution substation unit and a pole transformer unit.
8 Citations
5 Claims
-
1. A load leveling system of a power system comprising:
-
a function of being applied to the power system including a major customer and lower transforming apparatus connected to an upper transforming apparatus via a high-voltage line and a customer connected to the lower transforming apparatus via a low-voltage line, arranging a communication unit between the customer and its own system, and outputting change request information of an operation time of devices within the customer; a prediction function of predicting at least electric demands of the upper transforming apparatus and the lower transforming apparatus; and a function of outputting the change request information of the operation time of devices within the customer so as to reduce a maximum value of electric demands of both the upper transforming apparatus and the lower transforming apparatus. - View Dependent Claims (2, 3, 4, 5)
-
Specification