ELECTRICAL DEVICE CONTROL SYSTEM, SERVER, ELECTRICAL DEVICE, AND ELECTRICAL DEVICE CONTROL METHOD
First Claim
1. An electrical device control system comprising an electrical device, and a server which is communicably connected to the electrical device,wherein the electrical device includes:
- an input accepting unit for accepting an input of desired time information showing a desired operation start time or a desired operation end time of the electrical device;
an electrical device-side sending unit for sending, to the server, the desired time information accepted by the input accepting unit, and electric power information showing an electric power required for the electrical device to be operated; and
an operation control unit for controlling the operation of the electrical device,wherein the server includes;
a server-side receiving unit for receiving the desired time information and the electric power information sent by the electrical device-side sending unit;
an electric power charge information acquiring unit for acquiring electric power charge information showing an electric power charge which changes per hour;
a computing unit for computing an operation start time or an operation end time of the electrical device based on the desired time information and the electric power information received by the server-side receiving unit, and the electric power charge information acquired by the electric power charge information acquiring unit; and
a server-side sending unit for sending, to the electrical device, the operation start time or the operation end time computed by the computing unit, andwherein the operation control unit starts the operation of the electrical device according to the operation start time or the operation end time sent by the server-side sending unit.
3 Assignments
0 Petitions
Accused Products
Abstract
An input accepting unit accepts an input of desired time information showing a desired operation start time or a desired operation end time of a household electrical appliance, a sending unit sends, to a server, the desired time information, and electric power information showing an electric power required for the household electrical appliance to be operated, an electric power charge information acquiring unit acquires electric power charge information showing an electric power charge which changes per hour, an operation time computing unit computes an operation start time or an operation end time of the household electrical appliance based on the desired time information, the electric power information, and the electric power charge information, and an operation control unit starts the operation of the household electrical appliance according to the operation start time or the operation end time.
16 Citations
14 Claims
-
1. An electrical device control system comprising an electrical device, and a server which is communicably connected to the electrical device,
wherein the electrical device includes: -
an input accepting unit for accepting an input of desired time information showing a desired operation start time or a desired operation end time of the electrical device; an electrical device-side sending unit for sending, to the server, the desired time information accepted by the input accepting unit, and electric power information showing an electric power required for the electrical device to be operated; and an operation control unit for controlling the operation of the electrical device, wherein the server includes; a server-side receiving unit for receiving the desired time information and the electric power information sent by the electrical device-side sending unit; an electric power charge information acquiring unit for acquiring electric power charge information showing an electric power charge which changes per hour; a computing unit for computing an operation start time or an operation end time of the electrical device based on the desired time information and the electric power information received by the server-side receiving unit, and the electric power charge information acquired by the electric power charge information acquiring unit; and a server-side sending unit for sending, to the electrical device, the operation start time or the operation end time computed by the computing unit, and wherein the operation control unit starts the operation of the electrical device according to the operation start time or the operation end time sent by the server-side sending unit. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
-
12. A server which is communicably connected to an electrical device, comprising:
-
a receiving unit for receiving desired time information sent from the electrical device and showing a desired operation start time or a desired operation end time of the electrical device, and electric power information sent from the electrical device and showing an electric power required for the electrical device to be operated; an electric power charge information acquiring unit for acquiring electric power charge information showing an electric power charge which changes per hour; a computing unit for computing an operation start time or an operation end time of the electrical device based on the desired time information and the electric power information received by the receiving unit, and the electric power charge information acquired by the electric power charge information acquiring unit; and a sending unit for sending, to the electrical device, the operation start time or the operation end time computed by the computing unit.
-
-
13. An electrical device, comprising:
-
an input accepting unit for accepting an input of desired time information showing a desired operation start time or a desired operation end time of the electrical device; a sending unit for sending, to a server, the desired time information accepted by the input accepting unit, and electric power information showing an electric power required for the electrical device to be operated; a receiving unit for receiving an operation start time or an operation end time of the electrical device sent by the server which receives the desired time information and the electric power information sent by the sending unit, acquires electric power charge information showing an electric power charge which changes per hour, computes the operation start time or the operation end time based on the received desired time information and electric power information, and the acquired electric power charge information, and sends the computed operation start time or the operation end time to the electrical device; and an operation control unit for starting the operation of the electrical device according to the operation start time or the operation end time received by the receiving unit.
-
-
14. An electrical device control method performed by an electrical device control system provided with an electrical device, and a server which is communicably connected to the electrical device, the method comprising:
-
an input accepting step of an input accepting unit of the electrical device accepting an input of desired time information showing a desired operation start time or a desired operation end time of the electrical device; a first sending step of an electrical device-side sending unit of the electrical device sending, to the server, the desired time information accepted in the input accepting step, and electric power information showing an electric power required for the electrical device to be operated; a receiving step of a server-side receiving unit of the server receiving the desired time information and the electric power information sent in the first sending step; an electric power charge information acquiring step of an electric power charge information acquiring unit of the server acquiring electric power charge information showing an electric power charge which changes per hour; a computing step of a computing unit of the server computing an operation start time or an operation end time of the electrical device based on the desired time information and the electric power information received in the receiving step, and the electric power charge information acquired in the electric power charge information acquiring step; a second sending step of a server-side sending unit of the server sending, to the electrical device, the operation start time or the operation end time computed in the computing step; and an operation control step of an operation control unit of the electrical device starting the operation of the electrical device according to the operation start time or the operation end time sent in the second sending step.
-
Specification