×

RESOURCE MANAGEMENT SYSTEM

  • US 20130067478A1
  • Filed: 05/25/2011
  • Published: 03/14/2013
  • Est. Priority Date: 05/25/2010
  • Status: Abandoned Application
First Claim
Patent Images

1. A resource management system for monitoring a usage period of a resource used in respective operations of a plurality of loads in a predetermined space, comprising:

  • an information acquisition unit that periodically acquires information on a usage state of the resource as usage information;

    a data creation unit that creates data on a permitted usage period, which is a period when use of the resource is permitted;

    a period setting unit that sets a permitted usage period for each load based on the data on the permitted usage period created by the data creation unit;

    a determination unit that determines whether use of the resource corresponding to the usage information acquired by the information acquisition unit is within the permitted usage period; and

    a display unit that distinctively displays whether the usage period of the resource is within the permitted usage period based on the determination result by the determination unit, whereinthe data creation unit creates data on a single first permitted usage period, andthe period setting unit comprises a batch setting unit that performs batch setting whereby the first permitted usage period is set as the permitted usage periods of all the loads.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×