×

Systems and methods projecting available runtimes of emergency power supply systems

  • US 20130158893A1
  • Filed: 11/30/2012
  • Published: 06/20/2013
  • Est. Priority Date: 08/24/2006
  • Status: Abandoned Application
First Claim
Patent Images

75. A method for predicting an available run-time for one or more items of emergency power supply system (EPSS) equipment based on one or more actual fuel consumption rates and an actual fuel level within a fuel tank supplying the one or more items of EPSS equipment, comprising the steps of:

  • providing a management computer system that is coupled for data communications with the one or more items of EPSS equipment;

    providing fuel metering equipment that is operatively connected to the one or more items of EPSS equipment and to the management computer system, wherein the fuel metering equipment records a fuel consumption rate for each item of EPSS equipment and transmits each fuel consumption rate to the management computer system;

    monitoring the actual fuel level in the fuel tank;

    when at least one item of EPSS equipment is running, receiving one or more actual fuel consumption rates at the management computer system from the fuel metering equipment for the at least one item of EPSS equipment;

    calculating the available run-time for the at least one item of EPSS equipment based on the actual fuel level in the fuel tank and the one or more actual fuel consumption rates for the at least one item of EPSS equipment; and

    displaying the available run-time for the at least one item of EPSS equipment to a user via a user interface.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×