Energy Center

  • US 20130163192A1
  • Filed: 06/26/2012
  • Published: 06/27/2013
  • Est. Priority Date: 06/27/2011
  • Status: Active Grant
First Claim
Patent Images

1. A data center, comprising:

  • an information technology (IT) load;

    a fuel cell generator electrically coupled to the IT load and configured to provide power to the IT load;

    a building structure housing the fuel cell generator and the IT load; and

    a cooling device configured to use a process exhaust from at least one of the fuel cell generator and the IT load to cool at least one of the fuel cell generator and the IT load.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×