RESOURCE MANAGEMENT SYSTEM WITH RESOURCE OPTIMIZATION MECHANISM AND METHOD OF OPERATION THEREOF
First Claim
Patent Images
1. A method for operating a resource management system comprising:
- identifying a total-usage status of a resource currently being supplied;
calculating a current production amount of supplying the resource using the total-usage status;
calculating an assessment structure directly reflecting the current production amount; and
adjusting the assessment structure for modifying behavior associated with the current consumption of the resource.
1 Assignment
0 Petitions
Accused Products
Abstract
A method for operating a resource management system includes: identifying a total-usage status of a resource currently being supplied; calculating a current production amount of supplying the resource using the total-usage status; calculating an assessment structure directly reflecting the current production amount; adjusting the assessment structure for modifying behavior associated with the current consumption of the resource.
-
Citations
20 Claims
-
1. A method for operating a resource management system comprising:
-
identifying a total-usage status of a resource currently being supplied; calculating a current production amount of supplying the resource using the total-usage status; calculating an assessment structure directly reflecting the current production amount; and adjusting the assessment structure for modifying behavior associated with the current consumption of the resource. - View Dependent Claims (2, 3, 4, 5)
-
-
6. A method of operating a resource management system comprising:
-
identifying a client-usage status of a resource currently being consumed using a sensor network; identifying a total-usage status of the resource currently being supplied; calculating a current production amount of supplying the resource using the total-usage status; calculating an assessment structure directly reflecting the current production amount; and controlling the current consumption of the resource using the assessment structure and the client-usage status. - View Dependent Claims (7, 8, 9, 10)
-
-
11. A resource management system comprising:
-
a current-total module for identifying a total-usage status of a resource currently being supplied; a current-cost module, coupled to the current-total module, for calculating a current production amount of supplying the resource using the total-usage status; a cost reflection module, coupled to the current-cost module, for calculating an assessment structure directly reflecting the current production amount; and a demand management module, coupled to the current-cost module, adjusting the assessment structure for modifying behavior associated with the current consumption of the resource. - View Dependent Claims (12, 13, 14, 15, 16, 17, 18, 19, 20)
-
Specification