×

PREMATURE NEONATE CLOSED LIFE SUPPORT SYSTEM

  • US 20130267765A1
  • Filed: 08/27/2012
  • Published: 10/10/2013
  • Est. Priority Date: 04/04/2012
  • Status: Active Grant
First Claim
Patent Images

1. A magnetically permeable neonate transport capsule (MPNTC) for transporting a premature neonate from an host infant incubator having a steady environmental condition to an MRD;

  • said MPNTC having at least one first normally open configuration when said capsule is disposed within said incubator and a second closed configuration for removal, transportation, insertion, measurement and vice versa within an MRD device;

    said MPNTC comprises an environmental control system thereby adapted to maintain continuous attachment of said neonate with life support connection lines;

    said MPNTC is adapted to maintain environmental conditions substantially similar to said host infant incubator environmental condition when said MPNTC is transported from said incubator to said MRD device;

    said environmental control system is selected from the group consisting of heat insulation means, an operative connection to a temperature regulation system, an operative connection to a humidity regulation system, an operative connection to an air supply system, an operative connection to an oxygen regulation system, an operative connection to a CO2 regulation system;

    wherein said MPNTC'"'"'s environmental control system, by being adapted to maintain said environmental conditions substantially similar to said host infant incubator environmental condition when said MPNTC is transported from said incubator to said MRD device, meets at least one member of a group of standards consisting of IEC 6061-2-19 Standard Clauses 12 201.12.101 (Stability of incubator);

    IEC 201.12.102 (Uniformity of incubator temperature);

    IEC 201.12.103 (Accuracy of skin temperature sensor);

    IEC 201.12.1.104 (accuracy between skin temperature and control temperature during removal, transportation and insertion within said MRD device);

    IEC 201.12.1.108 (overshoot time) and/or IEC 12 201.12.1.107 (warm up time).

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×