Please download the dossier by clicking on the dossier button x
×

ISOLATED MEASUREMENT SYSTEM WITH COOPERATIVELY-TIMED ISOLATED POWER GENERATION

  • US 20130278077A1
  • Filed: 11/06/2012
  • Published: 10/24/2013
  • Est. Priority Date: 04/23/2012
  • Status: Active Grant
First Claim
Patent Images

1. A system for an isolated measurement system comprising:

  • a power transmitter provided on a first side of an isolation barrier,a power receiver provided on a second side of the isolation barrier,an isolator coupling the power transmitter to the power receiver, anda control system, provided in the first side, to provide a clock signal defining timing of a predetermined operation of a measurement system in the second side and to generate a disabling signal to the power transmitter controller synchronously with the timing of the predetermined operation.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×