CONTROL DEVICE AND CONTROL METHOD
First Claim
1. A control device comprising:
- a receiving unit configured to receive a control request signal, the control request signal indicating a request for controlling a total power amount consumed by an apparatus during a predetermined period to be equal to or lower than a predetermined limit;
an obtainment unit configured to obtain a power consumption amount consumed by the apparatus; and
a control unit configured to control the apparatus to operate according to the control request signal received by the receiving unit, and control the total power amount consumed by the apparatus during the predetermined period to be equal to or lower than the predetermined limit,wherein the control unit is configured to;
determine a first time in the predetermined period, based on the power consumption amount obtained by the obtainment unit;
control the apparatus to operate during a first period from a start of the predetermined period to the first time with power higher than average power calculated based on the predetermined limit and the predetermined period; and
control the apparatus to operate during a second period from the first time to end of the predetermined period with power lower than the average power.
3 Assignments
0 Petitions
Accused Products
Abstract
A control device includes: a receiving unit that receives a control request signal indicating a request for controlling a total consumed power amount during a predetermined period to be equal to or lower than a predetermined limit; an obtainment unit that obtains a consumed power consumption amount; and a control unit that controls the apparatus to operate according to the control request signal and control the total power amount to be equal to or lower than the predetermined limit. The control unit determines a first time in the predetermined period based on the power consumption amount obtained by the obtainment unit, controls the apparatus to operate during a first period up to the first time with power higher than average power, and controls the apparatus to operate during a second period from the first time with power lower than the average power.
18 Citations
19 Claims
-
1. A control device comprising:
-
a receiving unit configured to receive a control request signal, the control request signal indicating a request for controlling a total power amount consumed by an apparatus during a predetermined period to be equal to or lower than a predetermined limit; an obtainment unit configured to obtain a power consumption amount consumed by the apparatus; and a control unit configured to control the apparatus to operate according to the control request signal received by the receiving unit, and control the total power amount consumed by the apparatus during the predetermined period to be equal to or lower than the predetermined limit, wherein the control unit is configured to; determine a first time in the predetermined period, based on the power consumption amount obtained by the obtainment unit; control the apparatus to operate during a first period from a start of the predetermined period to the first time with power higher than average power calculated based on the predetermined limit and the predetermined period; and control the apparatus to operate during a second period from the first time to end of the predetermined period with power lower than the average power. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16)
-
-
17. A control method comprising:
-
receiving a control request signal, the control request signal indicating a request for controlling a total power amount consumed by an apparatus during a predetermined period to be equal to or lower than a predetermined limit; obtaining a power consumption amount consumed by the apparatus; and controlling the apparatus to operate according to the received control request signal, and control the total power amount consumed by the apparatus during the predetermined period to be equal to or lower than the predetermined limit, wherein the controlling includes; determining a first time in the predetermined period, based on the obtained power consumption amount; controlling the apparatus to operate during a first period from a start of the predetermined period to the first time with power higher than average power calculated based on the predetermined limit and the predetermined period; and controlling the apparatus to operate during a second period from the first time to end of the predetermined period with power lower than the average power. - View Dependent Claims (18)
-
-
19. An integrated circuit comprising:
-
a receiving unit configured to receive a control request signal, the control request signal indicating a request for controlling a total power amount consumed by an apparatus during a predetermined period to be equal to or lower than a predetermined limit; an obtainment unit configured to obtain a power consumption amount consumed by the apparatus; and a control unit configured to control the apparatus to operate according to the control request signal received by the receiving unit, and control the total power amount consumed by the apparatus during the predetermined period to be equal to or lower than the predetermined limit, wherein the control unit is configured to; determine a first time in the predetermined period, based on the power consumption amount obtained by the obtainment unit; controlling the apparatus to operate during a first period from a start of the predetermined period to the first time with power higher than average power calculated based on the predetermined limit and the predetermined period; and controlling the apparatus to operate during a second period from the first time to end of the predetermined period with power lower than the average power.
-
Specification