DATA SYNCHRONIZATION USING A COMPOSITE CHANGE CLOCK
First Claim
1. A method comprising:
- calculating a maximum sync anchor change number; and
creating a sync action entry, the sync action entry having a sync action change number and a composite change clock number, the composite change clock number set;
to the maximum sync anchor change number when the sync action change number of the sync action entry is less than the maximum sync anchor change number, andto the sync action change number of the sync action entry when the sync action change number of the sync action entry is less than a sync action change number of a subsequent sync action entry and the sync action change number of the sync action entry is greater than the maximum sync anchor change number.
1 Assignment
0 Petitions
Accused Products
Abstract
A method can include: calculating a maximum sync anchor change number; and creating a sync action entry, the sync action entry having a sync action change number and a composite change clock number, the composite change clock number set: to the maximum sync anchor change number when the sync action change number of the sync action entry is less than the maximum sync anchor change number, and to the sync action change number of the sync action entry when the sync action change number of the sync action entry is less than a sync action change number of a subsequent sync action entry and the sync action change number of the sync action entry is greater than the maximum sync anchor change number.
-
Citations
20 Claims
-
1. A method comprising:
-
calculating a maximum sync anchor change number; and creating a sync action entry, the sync action entry having a sync action change number and a composite change clock number, the composite change clock number set; to the maximum sync anchor change number when the sync action change number of the sync action entry is less than the maximum sync anchor change number, and to the sync action change number of the sync action entry when the sync action change number of the sync action entry is less than a sync action change number of a subsequent sync action entry and the sync action change number of the sync action entry is greater than the maximum sync anchor change number. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A computer readable medium, useful in association with a processor, including instructions configured to:
-
calculate a maximum sync anchor change number; and create a sync action entry, the sync action entry having a sync action change number and a composite change clock number, the composite change clock number set; to the maximum sync anchor change number when the sync action change number of the sync action entry is less than the maximum sync anchor change number, and to the sync action change number of the sync action entry when the sync action change number of the sync action entry is less than a sync action change number of a subsequent sync action entry and the sync action change number of the sync action entry is greater than the maximum sync anchor change number. - View Dependent Claims (9, 10, 11, 12, 13, 14)
-
-
15. A system comprising:
-
a sync processor configured to calculate a maximum sync anchor change number; and a data store, coupled to the processor, including a sync action entry, the sync action entry having a sync action change number and a composite change clock number, the composite change clock number set; to the maximum sync anchor change number when the sync action change number of the sync action entry is less than the maximum sync anchor change number, and to the sync action change number of the sync action entry when the sync action change number of the sync action entry is less than a sync action change number of a subsequent sync action entry and the sync action change number of the sync action entry is greater than the maximum sync anchor change number. - View Dependent Claims (16, 17, 18, 19, 20)
-
Specification