×

TOILET FLUSHING ASSEMBLY AND SEQUENCE

  • US 20140041109A1
  • Filed: 10/22/2013
  • Published: 02/13/2014
  • Est. Priority Date: 11/17/2009
  • Status: Active Grant
First Claim
Patent Images

1. A toilet comprising:

  • a bowl;

    a flush valve configured to control flow from the bowl; and

    a supply valve configured to control flow to the bowl;

    wherein the flush valve and the supply valve are configured such that during a flush sequence the supply valve and the flush valve are both opened and closed twice, first during a pre-rinse cycle and subsequently during a rinse cycle, the supply valve and the flush valve being closed at a start and end of the cycles and open between the start and end of the cycles.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×