AUTOMATED DEMAND RESPONSE GATEWAY
First Claim
Patent Images
1. A method for an automated demand response (ADR) gateway that reduces an electrical load in a facility having a building automation system, the method comprising:
- receiving a demand response message associated with a demand response event via a computer connected to a network, the demand response message identifying at least a duration of a demand response event and a target power level for the demand response event;
determining at least one demand group to activate at the start of the demand response event, where more than one demand group exist;
activating the at least one demand group for a maximum timer period to achieve a first power saving; and
activating a second demand group upon the expiration of a delay time when the at least one demand group fails to meet the target power level for the demand response event.
1 Assignment
0 Petitions
Accused Products
Abstract
A system and method for reducing an electrical load in a facility or building with an automated demand response server having a hierarchical grouping of demand stages and demand groups with associated timers that control the shedding of load in order to achieve the appropriate level of load reduction and ramping up devices in a controlled manner upon the expiration of a demand response event.
-
Citations
23 Claims
-
1. A method for an automated demand response (ADR) gateway that reduces an electrical load in a facility having a building automation system, the method comprising:
-
receiving a demand response message associated with a demand response event via a computer connected to a network, the demand response message identifying at least a duration of a demand response event and a target power level for the demand response event; determining at least one demand group to activate at the start of the demand response event, where more than one demand group exist; activating the at least one demand group for a maximum timer period to achieve a first power saving; and activating a second demand group upon the expiration of a delay time when the at least one demand group fails to meet the target power level for the demand response event. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. An automated demand response (ADR) gateway that reduces an electrical load in a facility having a building automation system, comprising:
-
a client in a computer with a processor connected to a network in receipt of a demand response message that is associated with a demand response event, the demand response message identifying at least a duration of a demand response event and a target power level for the demand response event; a memory with at least one demand group that is activated by the processor at the start of the demand response event, where more than one demand group exist in the memory; a first power reduction achieved by the execution of the at least one demand group, where the execution occurs until the expiration of a maximum time timer; and a second demand group in the memory that is activated by the processor upon the expiration of a delay time timer when the at least one demand group fails to meet the target power level for the demand response event. - View Dependent Claims (10, 11, 12, 13, 14, 15, 16)
-
-
17. A tangible computer readable media containing instructions, when executed by a processor result in a method for an automated demand response (ADR) gateway that reduces an electrical load in a facility having a building automation system, comprising instructions for:
-
receiving a demand response message associated with a demand response event via a computer connected to a network, the demand response message identifying at least a duration of a demand response event and a target power level for the demand response event; determining at least one demand group to activate at the start of the demand response event, where more than one demand group exists; activating the at least one demand group for a maximum time period to achieve a first power reduction; and activating a second demand group upon the expiration of a delay time when the at least one demand group fails to meet the target power level for the demand response event. - View Dependent Claims (18, 19, 20, 21, 22, 23)
-
Specification