System and Method for Addressing a Pneumatic Emergency in a Helper Locomotive
First Claim
Patent Images
1. A method for control in an electronically controlled pneumatic (ECP)-equipped train after transmission of a brake pipe emergency dump command message by a helper locomotive associated with the train comprising a plurality of cars, the method comprising:
- receiving the brake pipe emergency dump command message at an end-of-train (EOT) unit associated with the train;
transmitting an ECP emergency brake request message from the EOT unit to at least one car and a head-end-unit (HEU) of the train;
waiting a predetermined period of time after transmitting the ECP emergency brake request message, for receipt of an ECP head-of-train (HOT) brake command message transmitted by the HEU; and
opening a brake pipe dump valve if the ECP HOT brake command message has not been issued to the at least one car in the train within the predetermined period of time.
1 Assignment
0 Petitions
Accused Products
Abstract
Methods and systems for control and use in connection with an electronically controlled pneumatic (ECP)-equipped train after transmission of a brake pipe emergency dump command message by a helper locomotive associated with the train. These methods and systems are implemented in an effort to improve braking safety and reduce brake system recovery time of a train.
69 Citations
19 Claims
-
1. A method for control in an electronically controlled pneumatic (ECP)-equipped train after transmission of a brake pipe emergency dump command message by a helper locomotive associated with the train comprising a plurality of cars, the method comprising:
-
receiving the brake pipe emergency dump command message at an end-of-train (EOT) unit associated with the train; transmitting an ECP emergency brake request message from the EOT unit to at least one car and a head-end-unit (HEU) of the train; waiting a predetermined period of time after transmitting the ECP emergency brake request message, for receipt of an ECP head-of-train (HOT) brake command message transmitted by the HEU; and opening a brake pipe dump valve if the ECP HOT brake command message has not been issued to the at least one car in the train within the predetermined period of time. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. An end-of-train (EOT) unit for use in an electronically controlled pneumatic (ECP)-equipped train after transmission of a brake pipe emergency dump command message by a helper locomotive associated with the train, the EOT unit comprising:
-
a brake pipe dump valve; an EOT radio receiver for receiving the brake pipe emergency dump command message; an ECP transmitter for transmitting an ECP emergency brake request message; an ECP trainline receiver for receiving an ECP head-of-train (HOT) brake command message; and a processor for determining if the ECP HOT brake command message has been received within a predetermined period of time after transmitting the ECP emergency brake request message, and if a determination is made that the ECP HOT brake command message has not been received within the predetermined period of time, causing the brake pipe dump valve to be opened. - View Dependent Claims (10, 11, 12, 13)
-
-
14. A system for use in connection with an electronically controlled pneumatic (ECP)-equipped train after transmission of a brake pipe emergency dump command message by a helper locomotive associated with the train, the system comprising:
-
an end-of-train (EOT) radio network; a helper locomotive equipped with a virtual brake pipe connection, wherein the helper locomotive is configured to transmit the brake pipe emergency dump command message on the EOT radio network; an end-of-train unit situated on the train, wherein the EOT unit is configured to receive the brake pipe emergency dump command message from the EOT radio network, and in response thereto, transmit an ECP emergency braking request message on an ECP messaging network, wherein the EOT unit includes a brake pipe dump valve, and wherein at least one car in the train is configured to respond to an ECP emergency braking request message from the ECP messaging network from the EOT; and a head-end-unit (HEU) situated on the train, wherein the HEU of the train is configured to transmit an ECP HOT brake command message on the ECP messaging network, and wherein the EOT unit is further configured to open the brake pipe dump valve if the ECP HOT brake command message has not been received within a predetermined period of time after transmitting the ECP emergency brake request message. - View Dependent Claims (15, 16, 17, 18, 19)
-
Specification