METHOD FOR DETERMINING WIRING RISK AND WIRING RISK DETERMINATION SYSTEM
First Claim
1. A method for determining a wiring risk which is a method for determining a first risk that electric wires connected to a plurality of terminal devices are bundled into a single harness, and a second risk that harnesses fail at the same timein a wiring system in which the plurality of harnesses each as a bundle of electric wires are provided between the plurality of terminal devices and connected via connectors, whereinthe first risk is determined byidentifying the number of connectors to which a target harness identified from the plurality of harnesses is indirectly connected, andthe second risk is determined bymatching location information of the target harness to an influenced area by a hazard source, andidentifying whether the target harness passes through the influenced area.
1 Assignment
0 Petitions
Accused Products
Abstract
A method for determining a wiring risk is a method for determining a first risk that electric wires connected to a plurality of terminal devices are bundled into a single harness, and a second risk that harnesses fail at the same time, wherein the first risk is determined by identifying the number of connectors to which a target harness identified from the plurality of harnesses is indirectly connected, and the second risk is determined by matching location information of the target harness to an influenced area by a hazard source, and identifying whether the target harness passes through the influenced area.
12 Citations
12 Claims
-
1. A method for determining a wiring risk which is a method for determining a first risk that electric wires connected to a plurality of terminal devices are bundled into a single harness, and a second risk that harnesses fail at the same time
in a wiring system in which the plurality of harnesses each as a bundle of electric wires are provided between the plurality of terminal devices and connected via connectors, wherein the first risk is determined by identifying the number of connectors to which a target harness identified from the plurality of harnesses is indirectly connected, and the second risk is determined by matching location information of the target harness to an influenced area by a hazard source, and identifying whether the target harness passes through the influenced area.
-
7. A wiring risk determination system which determines a first risk that electric wires connected to a plurality of terminal devices are bundled into a single harness, and a second risk that harnesses fail at the same time
in a wiring system in which the plurality of harnesses each as a bundle of electric wires are provided between the plurality of terminal devices and connected via connectors, wherein the system includes a database that stores connection information between the connector and the harness, and location information of the harnesses and information on an influenced area by a hazard source, and a processing unit that determines the first risk and the second risk, and when a target harness identified from the plurality of harnesses is specified, the processing unit identifies the number of connectors to which the target harness is indirectly connected based on the connection information so as to determine the first risk, and matches the location information of the target harness to the influenced area information, and identifies whether the target harness passes through the influenced area so as to determine the second risk.
Specification