METHOD AND SYSTEM FOR TRAFFIC RESOURCES ALLOCATION
First Claim
1. A traffic lane control method for controlling lane traffic, comprising:
- dividing a road into one or more lanes;
providing a control line with a traffic light system or a lane control light system;
providing a control area with a pre-determined length before or after the control line in the direction of the traffic; and
controlling a traffic movement on the road by permitting a vehicle on one or more lanes to pass the control line; and
controlling a traffic movement on the road by prohibiting a vehicle on other lane to pass the control line.
1 Assignment
0 Petitions
Accused Products
Abstract
A traffic lane control method for controlling lane traffic around an intersection is provided. The method includes dividing a road into one or more lanes. The method also includes providing a control line with a traffic light system or a lane control light system. Further, the method includes providing a control area with a pre-determined length before or after the control line in the direction of the traffic. The method also includes controlling traffic movement on the road by permitting a vehicle on one or more lanes to pass the control line, and controlling a traffic movement on the road by prohibiting a vehicle on other lane to pass the control line.
-
Citations
20 Claims
-
1. A traffic lane control method for controlling lane traffic, comprising:
-
dividing a road into one or more lanes; providing a control line with a traffic light system or a lane control light system; providing a control area with a pre-determined length before or after the control line in the direction of the traffic; and controlling a traffic movement on the road by permitting a vehicle on one or more lanes to pass the control line; and controlling a traffic movement on the road by prohibiting a vehicle on other lane to pass the control line. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A method for controlling traffic, comprising:
-
providing a cushion zone with a first pre-determined length, a control zone with a second pre-determined length, and a rear zone on a road, the cushion zone being closest to a stop line with a traffic light system and the rear zone being farthest to the stop line, wherein a traffic on the road traveling in the direction from the rear zone to the stop line; and instructing vehicles in the cushion zone, the control zone, and the rear zone during a traffic light cycle. - View Dependent Claims (10, 11, 12, 13, 14, 15, 16)
-
-
17. A traffic resource allocation method for allocating traffic resources around a T shaped intersection formed by a first road and a second road, the method comprising:
-
dividing the first road into two or more first lanes at a first direction and two or more second lanes at a second direction opposite but parallel to the first direction; dividing the second road into two or more third lanes at a third direction and two or more fourth lanes at a fourth direction opposite but parallel to the third direction; and controlling traffic movements in the intersection by allocating traffic passing permit to pedestrian traffic and vehicle traffic on the first road and the second road, when permitting pedestrian traffic along the first direction and the second direction, permitting through vehicle traffic along the first direction and the second direction, and prohibiting turn traffic at any of the first, second, and third directions. - View Dependent Claims (18, 19, 20)
-
Specification