METHOD OF PLANNING A ROUTE TO A DESTINATION
2 Assignments
0 Petitions
Accused Products
Abstract
The present invention combines the geographical coverage possible with fixed, pre-defined route segment costs (e.g. the legal speed limit) with, wherever possible, richer time dependent costs. A user of, for example, a portable navigation device, can therefore continue route planning as before to virtually any destination in a country covered by the stored map database, but wherever possible, can also use traffic data with time-dependent costs, so that the effect of congestion with any time predictability can be accurately taken into account as an automatic, background process. It leaves the user to simply carry on driving, following the guidance offered by the navigation device, without needing to be concerned about congestion that exists now, and whether it will impact his journey.
-
Citations
73 Claims
-
1-56. -56. (canceled)
-
57. A routing system, comprising memory storing a map database that defines roads in terms of route segments, the map database including:
-
a fixed, predefined time-independent cost associated with each different route segment in the map database; and a historical time-dependent cost, for each of a plurality of time windows, associated with at least some of the route segments in the map database, the cost relating to an average vehicle speed or transit time along the route segment measured or inferred from historical vehicle traffic flow or movement obtained by a traffic monitoring system, the routing system being arranged to receive updated time-dependent costs for one or more route segments for at least one of a current and future time based on an identification of currently congested route segments by the traffic monitoring system, and the routing system being programmed with software comprising a routing algorithm that enables a route to be planned to a destination at a specific time using one or more route segments and that calculates an estimated cost of reaching that destination by automatically using;
(i) the time-dependent cost for a route segment if available, the time-dependent cost being a received updated cost for the specific time when the route segment is planned to be traversed or, if an updated cost has not been received, the historical cost for the appropriate time window;
or (ii) the fixed, predefined time-independent cost for a route segment if a time-dependent cost for the route segment is not available in the map database. - View Dependent Claims (58, 59, 60, 61, 62, 63, 65)
-
-
64. A traffic monitoring system comprising a processing module arranged to process data representative of vehicles moving along roads in a designated geographical area, the roads being defined in a map database in terms of route segments, to measure traffic speed or transit time data as a function of time, wherein the processing module is arranged to:
-
generate a database of historical time-dependent traffic speeds or transit times for at least some route segments in the map database, the data associated with a route segment comprising an average traffic speed or transit time along the route segment for each of a plurality of time windows; identify currently congested route segments on which the current traffic speed or transit time is less than expected; and predict a traffic speed or transit time for a future time for at least one currently congested route segment based on a comparison of recently observed traffic speeds or transits times for the at least one segment with the historical average traffic speed or transit time for the appropriate time window.
-
-
66. A method of planning a route to a destination, comprising:
-
using a map database that defines roads in terms of route segments, the map database including;
a fixed, predefined time-independent cost associated with each different route segment in the map database; and
a historical time-dependent cost, for each of a plurality of time windows, associated with at least some of the route segments in the map database, the cost relating to an average vehicle speed or transit time along the route segment measured or inferred from historical vehicle traffic flow or movement obtained by a traffic monitoring system;receiving updated time-dependent costs for one or more route segments for at least one of a current and future time based on an identification of currently congested route segments by the traffic monitoring system; and using software comprising a routing algorithm that enables a route to be planned to a destination at a specific time using one or more route segments and that calculates an estimated cost of reaching that destination by automatically using;
(i) the time-dependent cost for a route segment if available, the time-dependent cost being a received updated cost for the specific time when the route segment is planned to be traversed or, if an updated cost has not been received, the historical cost for the appropriate time window;
or (ii) the fixed, predefined time-independent cost for a route segment if a time-dependent cost for the route segment is not available in the map database. - View Dependent Claims (67, 68, 69, 70, 72)
-
-
71. A method in which data representative of vehicles moving along roads in a designated geographical area, the roads being defined in a map database in terms of route segments, is processed by a processing module of a traffic monitoring system to measure traffic speed or transit time data as a function of time, the method comprising:
-
generating a database of historical time-dependent traffic speeds or transit times for at least some route segments in the map database, the data associated with a route segment comprising an average traffic speed or transit time along the route segment for each of a plurality of time windows; identifying currently congested route segments on which the current traffic speed or transit time is less than expected; and predicting a traffic speed or transit time for a future time for at least one currently congested route segment based on a comparison of recently observed traffic speeds or transits times for the at least one segment with the historical average traffic speed or transit time for the appropriate time window. - View Dependent Claims (73)
-
Specification