×

PHOTOVOLTAIC INSTALLATION AND METHOD OF OPERATING THE INSTALLATION WITH DELAYED BATTERY CONNECTION IN CASE OF AN EMERGENCY REQUEST

  • US 20140167505A1
  • Filed: 02/20/2014
  • Published: 06/19/2014
  • Est. Priority Date: 08/20/2011
  • Status: Active Grant
First Claim
Patent Images

1. A photovoltaic installation, comprising:

  • a plurality of partial photovoltaic installations each including a photovoltaic generator disposed for connection to an input of an associated inverter, wherein an MPP control element for setting a maximum power point of the respective said partial photovoltaic installation connected thereto is inherent to said inverter, and each of said partial photovoltaic installations including a battery connectible in parallel to said photovoltaic generatorall of said inverters of said partial photovoltaic installations having outputs connectible to a common electrical grid operated by a grid operator;

    a control device configured to initiate the following measures upon receiving from the grid operator an emergency signal on occasion of an imminent instability of the electrical grid;

    i) if a battery voltage lies above a voltage currently set by said MPP control element, causing an immediate connection of the battery to the input of said inverter while at the same time maintaining a connection of said photovoltaic generator to said inverter; and

    ii) if the battery voltage lies below the voltage currently set by said MPP control element, deferring a connection of the battery to the input of said inverter until said MPP control element has adjusted the voltage applied to the input to the battery voltage. and, following a connection of the battery, further reducing the voltage in order to generate a discharge current from the battery.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×