Concrete Storage Facility
First Claim
Patent Images
1. A concrete storage facility comprising:
- a first pre-stressed concrete side panel having a first upright edge and a first panel flange extending substantially perpendicularly from the first upright edge of the first side panel;
a second pre-stressed concrete side panel positioned opposite the first pre-stressed concrete side panel, the second side panel having a second upright edge and a second panel flange extending from the second upright edge, the second panel flange extending toward the first panel flange;
a first angle bracket on the first side panel, the first angle bracket including a first bracket flange protruding from the first angle bracket substantially parallel to the first panel flange;
a first flange gap between the first bracket flange and the first panel flange;
a second angle bracket on the second side panel, the second angle bracket including a second bracket flange protruding from the second angle bracket substantially parallel to the second panel flange;
a second flange gap between the second bracket flange and the second panel flange; and
a pre-stressed concrete door having a first upright door edge slidably disposed in the first flange gap and a second upright door edge slidably disposed in the second flange gap.
0 Assignments
0 Petitions
Accused Products
Abstract
A pre-stressed concrete storage apparatus includes a plurality of panels secured together to form a hollow interior space for storing items. An outer door panel is selectively moveable for restricting access to the interior of the apparatus. A secondary metal door and cage assembly is located behind the primary outer door panel for further restricting access to the interior of the storage apparatus. A pulley system is provided for mechanically lifting and lowering the outer door panel.
-
Citations
5 Claims
-
1. A concrete storage facility comprising:
-
a first pre-stressed concrete side panel having a first upright edge and a first panel flange extending substantially perpendicularly from the first upright edge of the first side panel; a second pre-stressed concrete side panel positioned opposite the first pre-stressed concrete side panel, the second side panel having a second upright edge and a second panel flange extending from the second upright edge, the second panel flange extending toward the first panel flange; a first angle bracket on the first side panel, the first angle bracket including a first bracket flange protruding from the first angle bracket substantially parallel to the first panel flange; a first flange gap between the first bracket flange and the first panel flange; a second angle bracket on the second side panel, the second angle bracket including a second bracket flange protruding from the second angle bracket substantially parallel to the second panel flange; a second flange gap between the second bracket flange and the second panel flange; and a pre-stressed concrete door having a first upright door edge slidably disposed in the first flange gap and a second upright door edge slidably disposed in the second flange gap. - View Dependent Claims (2, 3, 4, 5)
-
Specification