POWER DISTRIBUTION DEVICE
First Claim
1. A power distribution device connected with a plurality of storage batteries and with a load device consuming electric power and operative to distribute electric power from the storage batteries to the load device, said power distribution device comprising:
- an acquisition portion for acquiring deterioration degree information indicating degrees of deterioration of the storage batteries from the storage batteries;
a decision portion for making a decision as to which of the storage batteries is discharged first out of the plurality of storage batteries, based on the acquired deterioration degree information; and
a transmission portion for issuing an instruction for electrical discharge to the storage battery decided to be discharged first.
1 Assignment
0 Petitions
Accused Products
Abstract
There is a request for charging and discharging of a lithium-ion battery with as less degradation as possible. In an operation using only binary values as in conventional technology, however, in a charged state in which the battery is used, there is a high possibility that the battery is used toward accelerating the degradation thereof. In a power distribution device for distributing power between a plurality of batteries and a plurality of customers, when distributing the power of the batteries to the loads of the customers, by being based at least on the degradation information of the batteries, the state of charge, and the temperature data of the batteries, a battery discharging function is achieved that makes the degradation of the batteries minimum.
50 Citations
14 Claims
-
1. A power distribution device connected with a plurality of storage batteries and with a load device consuming electric power and operative to distribute electric power from the storage batteries to the load device, said power distribution device comprising:
-
an acquisition portion for acquiring deterioration degree information indicating degrees of deterioration of the storage batteries from the storage batteries; a decision portion for making a decision as to which of the storage batteries is discharged first out of the plurality of storage batteries, based on the acquired deterioration degree information; and a transmission portion for issuing an instruction for electrical discharge to the storage battery decided to be discharged first. - View Dependent Claims (2, 3, 4, 5, 6)
-
-
7. A method of distributing electric power from a plurality of storage devices to a load device consuming electric power, said method comprising the steps of:
-
acquiring deterioration degree information indicating degrees of deterioration of the storage batteries from the plurality of storage batteries; determining which of the plurality of storage batteries is discharged first out of the plurality of storage batteries, based on the acquired deterioration degree information; and issuing an instruction to cause the determined storage battery to electrically discharge. - View Dependent Claims (8, 9, 10, 11, 12)
-
-
13. A power distribution device connected with a controller that manages storage batteries and a load device consuming electric power, the power distribution device being operative to distribute electric power from the storage batteries to the loading device, said controller being plural in number, said power distribution device comprising:
-
an acquisition portion for acquiring deterioration degree information indicating degrees of deterioration of the storage batteries from the storage batteries via the controllers; a decision portion for making a decision as to which of the storage batteries is discharged first out of the storage batteries, based on the acquired deterioration degree information; and a transmission portion for issuing an instruction for electrical discharge to the storage battery decided to be discharged first via the controller. - View Dependent Claims (14)
-
Specification