×

Side Saddle Substructure

  • US 20140224543A1
  • Filed: 02/13/2014
  • Published: 08/14/2014
  • Est. Priority Date: 02/13/2013
  • Status: Active Grant
First Claim
Patent Images

1. A drilling rig comprising:

  • a first substructure;

    a second substructure, the second substructure being positioned generally parallel to and spaced apart from the first substructure and being generally the same height as the first substructure;

    a drill floor coupled to the first and second substructures, the drill floor positioned substantially at the top of the first and second substructures.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×