METHOD OF DETECTING PRELOAD OF BALL SCREW
First Claim
1. A method of detecting a preload of a ball screw for tracking the preload of the ball screw via a detection device, a signal-capturing device, and a computer, the detection device being connected with or close to the ball screw for detecting an operational status of the ball screw, the operational status containing rotary speed of the ball screw and vibration or sound of the ball screw, the signal-capturing device being connected with the detection device and the computer for receiving and converting the operational status into an operational signal, the computer storing a preload judgment program, which can be operated by the computer to carry out the method when the ball screw is working, the method comprising steps of:
- receiving the operational signal;
processing the operational signal;
carrying out an order tracking analysis procedure for statistical analysis of the operational signal for tracking an actual ball pass order of the ball screw;
providing a theoretical ball pass order indicating that the ball screw is devoid of any preload; and
carrying out a preload judgment procedure having an order comparison sub-procedure and a quantification side band sub-procedure where the order comparison sub-procedure is to compare difference between the actual ball pass order and the theoretical ball pass order and the quantification side band sub-procedure is to judge proportion of occurrence of side band around the actual ball pass order;
if the order comparison sub-procedure judges that the actual ball pass order is away from the theoretical ball pass order, the preload judgment procedure will judge that the ball screw is of preload;
if the order comparison sub-procedure judges that the actual ball pass order approaches the theoretical ball pass order and the quantification judgment procedure judges that the actual ball pass order is not accompanied with any side band, the preload judgment procedure will judge that the ball screw is of preload;
if the order comparison procedure judges that the actual ball pass order approaches the theoretical ball pass order and the quantification side band procedure judges that the actual ball pass order is accompanied with certain side band, the preload judgment procedure judges that the ball screw is devoid of any preload.
1 Assignment
0 Petitions
Accused Products
Abstract
A method of detecting a preload of a ball screw is to acquire an operational signal of the ball screw, to process the operational signal via a theoretical ball pass order and an order tracking analysis procedure to acquire an actual ball pass order, to compare and judge the relationship between the actual ball pass order and the theoretical ball pass order via a preload judgment procedure, and finally to observe the proportion of occurrence of side band of the actual ball pass order to determine the preload status of the ball screw.
12 Citations
3 Claims
-
1. A method of detecting a preload of a ball screw for tracking the preload of the ball screw via a detection device, a signal-capturing device, and a computer, the detection device being connected with or close to the ball screw for detecting an operational status of the ball screw, the operational status containing rotary speed of the ball screw and vibration or sound of the ball screw, the signal-capturing device being connected with the detection device and the computer for receiving and converting the operational status into an operational signal, the computer storing a preload judgment program, which can be operated by the computer to carry out the method when the ball screw is working, the method comprising steps of:
-
receiving the operational signal; processing the operational signal; carrying out an order tracking analysis procedure for statistical analysis of the operational signal for tracking an actual ball pass order of the ball screw; providing a theoretical ball pass order indicating that the ball screw is devoid of any preload; and carrying out a preload judgment procedure having an order comparison sub-procedure and a quantification side band sub-procedure where the order comparison sub-procedure is to compare difference between the actual ball pass order and the theoretical ball pass order and the quantification side band sub-procedure is to judge proportion of occurrence of side band around the actual ball pass order;
if the order comparison sub-procedure judges that the actual ball pass order is away from the theoretical ball pass order, the preload judgment procedure will judge that the ball screw is of preload;
if the order comparison sub-procedure judges that the actual ball pass order approaches the theoretical ball pass order and the quantification judgment procedure judges that the actual ball pass order is not accompanied with any side band, the preload judgment procedure will judge that the ball screw is of preload;
if the order comparison procedure judges that the actual ball pass order approaches the theoretical ball pass order and the quantification side band procedure judges that the actual ball pass order is accompanied with certain side band, the preload judgment procedure judges that the ball screw is devoid of any preload. - View Dependent Claims (2, 3)
-
Specification