×

HYDROELECTRIC POWER GENERATION PLAN ADJUSTING DEVICE, HYDROELECTRIC POWER GENERATION PLAN ADJUSTING METHOD AND PROGRAM

  • US 20140324237A1
  • Filed: 12/06/2011
  • Published: 10/30/2014
  • Est. Priority Date: 12/06/2011
  • Status: Abandoned Application
First Claim
Patent Images

1. A device for adjusting a plan of hydroelectric power generation, communicatively connected to a supply-demand planning device and each of a plurality of hydroelectric power generation planning devices, the supply-demand planning device calculating an optimal value of an output per a unit time by the hydroelectric power generation as well as calculating an optimal value of a power price per the unit time, and the each of the plurality of the hydroelectric power generation planning devices planning the output by the hydroelectric power generation in accordance with the power price, the hydroelectric power generation plan adjusting device comprising:

  • an optimal supply-demand plan acquiring unit configured to acquire from the supply-demand planning device the optimal value of the output per the unit time and the optimal value of the power price;

    a price signal creation unit configured to create a price signal that is a value obtained by converting the optimal value of the power price using a predetermined algorithm;

    a power generation planning device control unit that controls the hydroelectric power generation planning devices to plan the output in accordance with the price signal and acquires planned values of the output from the hydroelectric power generation planning devices; and

    a price adjusting unit configured to increase or reduce the power price for the unit period in which a difference between a total value of the planned values of the output and the optimal value of the output is equal to or greater than a predetermined output difference threshold value,wherein the price signal creation unit creates the price signal by converting the increased or reduced power price, andthe power generation planning device control unit re-controls the hydroelectric power generation planning devices to plan the output in accordance with the created price signal.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×