×

OPTIMIZED HYDROMODIFICATION MANAGEMENT WITH ACTIVE STORMWATER CONTROLS

  • US 20140350737A1
  • Filed: 05/27/2014
  • Published: 11/27/2014
  • Est. Priority Date: 05/24/2013
  • Status: Active Grant
First Claim
Patent Images

1. A method of enabling hydromodification management to compensate for changes in water runoff characteristics resulting from altered land use, the method comprising:

  • creating parameters of a pre- and post-development continuous hydrologic simulation model of a drainage management area of interest;

    defining pre- and post-development flow duration data based upon the hydrologic simulation;

    defining desired post-development flow duration data resulting from use of flow control;

    creating flow rating data from the defined flow duration data;

    defining the physical parameters of a runoff detention facility having a water outlet with a selectively adjustable opening;

    defining control parameters for controlling the size of the outlet opening on the basis of the created flow rating data and the defined physical parameters;

    programming a controller in communication with the outlet with the control parameters, the controller for controlling the outlet opening and thereby providing the flow control; and

    actively monitoring characteristics associated with the detention facility over time to define an actual post-development flow duration.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×