Set-Delayed Cement Compositions Comprising Pumice and Associated Methods
First Claim
Patent Images
1. A set-delayed cement composition comprisingwater;
- pumice;
hydrated lime; and
a set retarder,wherein the set-delayed cement composition will remain in a pumpable fluid state for a time period of at least about 1 day.
1 Assignment
0 Petitions
Accused Products
Abstract
A variety of methods and compositions are disclosed, including, in one embodiment, a method of cementing in a subterranean formation, comprising: providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder; activating the set-delayed cement composition; introducing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation.
15 Citations
20 Claims
-
1. A set-delayed cement composition comprising
water; -
pumice; hydrated lime; and a set retarder, wherein the set-delayed cement composition will remain in a pumpable fluid state for a time period of at least about 1 day. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. A set-delayed cement composition comprising
water; -
pumice; hydrated lime in an amount of about 10% to about 50% by weight of the pumice; dispersant in an amount of about 0.01% to about 5% by weight of the pumice; and a set retarder in an amount of about 0.01% to about 10% by weight of the pumice, wherein the set-delayed cement composition will remain in a pumpable fluid state for a time period of at least about 1 day. - View Dependent Claims (12, 13, 14, 15, 16, 17, 18)
-
-
19. A set-delayed cement composition comprising
water; -
pumice; hydrated lime; a polycarboxylated ether dispersant; and a phosphonic acid derivative set retarder, wherein the set-delayed cement composition will remain in a pumpable fluid state for a time period of at least about 7 days. - View Dependent Claims (20)
-
Specification