USER EQUIPMENT AND METHOD FOR ENHANCED UPLINK POWER CONTROL
First Claim
1. User Equipment (UE) comprising:
- processing circuitry arranged to;
determine whether a total desired transmission power over a plurality of channels exceeds a total configured maximum output power for a subframe when the UE is scheduled for concurrent physical uplink control channel (PUCCH) and physical uplink shared channel (PUSCH) transmission by an enhanced node B (cNB) in the subframe;
initially allocate a minimum proactive power to the channels; and
allocate any remaining power of a power budget to the channels based on priority, anda transceiver configured by the processing circuitry to transmit the channels in accordance the minimum proactive power and the remaining power allocations,wherein the PUCCH of a primary cell (PCell) is allocated power as a first priority, PUSCH with downlink control information (DCI) of the PCell is allocated power as a second priority, and a PUSCH without DCI of a secondary cell (SCell) is allocated power as a lowest priority.
2 Assignments
0 Petitions
Accused Products
Abstract
Embodiments of user equipment and methods for improved uplink transmission power management and scheduling, are generally described herein. For example, in an aspect, a method of uplink power management is presented, the method includes determining whether a total desired transmission power exceeds a total configured maximum output power for a subframe. When the total desired transmission power exceeds the total configured maximum output power, the method includes allocating a minimum proactive power limitation to each serving cell, assigning a remaining power to one or more channels based on priority, and computing a total power assignment based on the allocating and the assigning.
-
Citations
20 Claims
-
1. User Equipment (UE) comprising:
-
processing circuitry arranged to; determine whether a total desired transmission power over a plurality of channels exceeds a total configured maximum output power for a subframe when the UE is scheduled for concurrent physical uplink control channel (PUCCH) and physical uplink shared channel (PUSCH) transmission by an enhanced node B (cNB) in the subframe; initially allocate a minimum proactive power to the channels; and allocate any remaining power of a power budget to the channels based on priority, and a transceiver configured by the processing circuitry to transmit the channels in accordance the minimum proactive power and the remaining power allocations, wherein the PUCCH of a primary cell (PCell) is allocated power as a first priority, PUSCH with downlink control information (DCI) of the PCell is allocated power as a second priority, and a PUSCH without DCI of a secondary cell (SCell) is allocated power as a lowest priority. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. A method of uplink power management in user equipment (UE), the method comprising:
-
determining whether a total desired transmission power over a plurality of channels, each of the channels associated with a primary cell (PCell) or one or more secondary cells (SCells), exceeds a total configured maximum output power for a subframe, and where the total desired transmission power exceeds the total configured maximum output power; allocating a minimum proactive power limitation to the PCell and one or more SCells associated with the UE; assigning a remaining power to one or more channels based on priority; and computing a total power assignment based on the allocating and the assigning, wherein the total power assignment governs an uplink power allocated to the one or more channels, wherein the plurality of channels include a physical uplink control channel (PUCCH) and a physical uplink control channel (PUCCH). - View Dependent Claims (9, 10, 11, 12, 13, 14)
-
-
15. A non-transitory machine readable storage medium comprising instructions that in response to being executed, cause processing circuitry to:
-
determine whether a total desired transmission power over a plurality of channels exceeds a total configured maximum output power for a subframe when a user equipment (UE) is scheduled for concurrent physical uplink control channel (PUCCH) and physical uplink shared channel (PUSCH) transmission by an enhanced node B (eNB) in the subframe; initially allocate a minimum proactive power to the channels; and allocate any remaining power of a power budget to the channels based on priority, wherein the PUCCH of a primary cell (PCell) is allocated power as a first priority, a PUSCH with downlink control information (DCI) of the PCell is allocated power as a second priority, and a PUSCH without DCI of a secondary cell (SCell) is allocated power as a lowest priority. - View Dependent Claims (16, 17, 18)
-
-
19. User equipment (UE) comprising:
-
one or more antennas; processing circuitry arranged to; determine whether a total desired transmission power over a plurality of channels exceeds a total configured maximum output power for a subframe when the UE is scheduled for concurrent physical uplink control channel (PUCCH) and physical uplink shared channel (PUSCH) transmission by an enhanced node B (eNB) in the subframe; initially allocate a minimum proactive power to the channels; and allocate any remaining power of a power budget to the channels based on priority, and a transceiver coupled to the one or more antennas and configured by the processing circuitry to transmit the channels in accordance the minimum proactive power and the remaining power allocations. - View Dependent Claims (20)
-
Specification