×

METHOD FOR IMPROVING ISOLATION OF FLOW TO COMPLETED PERFORATED INTERVALS

  • US 20150083423A1
  • Filed: 12/01/2014
  • Published: 03/26/2015
  • Est. Priority Date: 11/22/2011
  • Status: Active Grant
First Claim
Patent Images

1. A method of building a plug in a horizontal wellbore which penetrates a subterranean formation, the method comprising:

  • (a) pumping a fluid pill into the wellbore wherein the fluid pill comprises a suspended well treatment composite, the well treatment composite comprising a core having a dissolvable diverter and a deformable particulate, a viscosifying agent and a crosslinking agent, wherein the viscosifying agent and crosslinking agent are coated onto the core;

    (b) disassociating at least a portion of the dissolvable diverter from the core of the well treatment composite and rendering a modified fluid pill comprising the deformable particulate and viscosifying polymer and crosslinking agent coated onto the deformable particulate;

    (c) blocking at least a portion of a high permeability zone of a subterranean formation with the disassociated dissolvable diverter;

    (d) diverting the flow of the modified fluid pill from a high permeability zone to a lower permeability zone of a subterranean formation;

    (e) allowing at least one fracture in the lower permeability zone of the subterranean formation to partially close;

    (f) at least partially preventing the deformable particulate from entering the at least one fracture by forming a thickened gel containing the deformable particulate, wherein the thickened gel is formed by the in-situ reaction of;

    (i) the crosslinking agent disassociated from the core; and

    (ii) viscosifying polymer disassociated from the core; and

    (g) forming a fluid-impermeable plug with the thickened gel containing the deformable particulate.

View all claims
  • 4 Assignments
Timeline View
Assignment View
    ×
    ×